How to Fire GC?!

15 years ago

How hard is it to fire your General Contractor? BTW, he's my brother!

We had a verbal understanding that my husband and I would make all decisions but he would act more so as a construction manager/advisor. A contract was prepared, which I thought (and was discussed)was for bank purposes. He is listed as the GC with the bank and county. The contract was a fixed price for build, in which we set b/c we knew our budget and had gotten bids on things we wanted for the house.

This is something my brother does on the side, he has a full-time job. So I am the one at the site everyday catching mistakes and such. He is there maybe 2-3 times a week just stopping through.

We are in the framing stage of the build. The contractors we have used so far has been the ones I initially contacted. We did use his framer b/c he says he was a few thousand cheaper and he had a relationship with already. That was understandable.

We have gotten our first draw ready to pay bills. My brother now says we are $7,000 over on the concrete. That may be true but he doesn't want to produce any bills. It makes me feel like he's trying to hide something. He has told the concrete contractor not to talk to me, only him directly. This is not the arrangement I want for my build, which he knew.

Also his HVAC guy, has yet to produce a manual load for me. (need right now for energy star rater). It has been over a month since I asked the HVAC guy. Basically, he never produced did one for the quote. It was based on Sq. footage per my brother. What in the world? I have 3 quotes already and would now prefer to go with one of these guys.

Communication-- has been terrible. I have to find things out by the crew. He only answers the phone half of the time.

Right now, I don't trust him and wish I would have went ahead and GC'ed myself.

Can you believe it? My brother!

Comments (7)

  • 15 years ago
    last modified: 11 years ago

    Tough situation. Sorry to ask, but if you are the one doing all the leg work, why did you ask or hire him to be the GC if this not what he really does for a living? Just trying to fully understand. Sounds like you should have been the GC.

  • 15 years ago
    last modified: 11 years ago

    If your brother is liable for the payment of costs above the fixed contract price, he is a General Contractor, not a Construction Manager. If you are paying the subs with fixed price sub-contracts in your name then you are the general contractor and he is your manager.

    The contract should spell out what either party must do to terminate the contract. The process normally starts with a letter informing the other party of the termination. You will probably have to pay the bills due at this time in order to avoid liens unless you can negotiate with the subs after the contract is terminated; they will be more willing to talk to you when you are the GC.

  • 15 years ago
    last modified: 11 years ago

    Horrible situation!

    I truly think the first thing you need to do is talk to an attorney who specializes in construction law and construction loan financing. You need someone who knows the law of your jurisdiciton AND can fully understand the implications of the agreement you and your brother signed between you as well as all the paperwork you signed with the bank listing your brother as GC.

    Take copies of every single document you've signed with respect to the build with you when you go to see the lawyer...including anything related to your original land purchase. Also take copies of every lien release and bill you've received as well as every check you've written to pay people. Your lawyer may not need to see all of it but it'll be better(and cheaper) to have everything with you rather than having to send it to him later.

    Explain to the lawyer that, at this point, you don't want him to DO anything (no lawsuit, no letter writing, etc.) You just need guidance on the implications of firing your brother as GC and you want to know what you can/should do to protect yourself from further harm as you carry out that process. The lawyer should be willing to assist you on an "hourly basis." Be prepared for sticker shock re his hourly billing rate! But, if you get the answers you need while you are WITH the lawyer you can control how much time he bills you for. Do NOT agree to him doing "research" and "getting back to you" unless the amount of time he will bill you for that research is strictly capped. (The last thing you want is an unexpected attorney bill!)


    Among other things, before you fire your brother, your lawyer will probably tell you that you need to make sure that you have lien releases from him AND from all subs that he has had do any work on your property...otherwise he and/or his subs can file liens against your home making it impossible for you to get a mortgage when you're done building it without first paying off those liens. The lawyer should be able to provide you with a standard lien release form that is used in your jurisdiction. And he can explain exactly how the documents need to be filled out and what to do with them once they are filled.

    You'll probably also have to talk to your banker and get his approval for you to take over as GC... assuming you are even allowed to to that in your state. In some states anyone can GC their own home. In others, you have to have a builder's license to build/remodel a residence. In states that require a license, some just require you to pay a fee and show that you don't have any felony convictions. In others, you have to actually undergo a certain amount of training first. And, even if your state will allow you to be the GC, many banks don't like having owner-builders as clients. So, you may have no choice but to hire someone else to act as GC. If so, see if some company like "Owner-Builder Network" or "Help You Build" or "You Build It" operates in operates in your state. They will often step in as putative GC although they do charge a fee for the service. Assuming your state will allow you to GC your own build, your lawyer can give you guidance on how best to deal with your banker to get him/her on board with you taking over.

    Firing a builder can be tricky. I know. I've been there and, although I AM a lawyer, I don't practice construction law and I made a couple of expensive mistakes that I'm still dealing with more than 2 years down the road. Furthermore, firing your brother will be even trickier because even if, at this point, you're ready to write him off your Xmas list and out of your will completely, I'm sure you do want to preserve your relationships with other family members. A fight between you and your bother WILL affect those relationships b/c family members can't help but take sides.

    After you've talked to a lawyer and know all the legal ramifications, the next step would probably be to talk to your brother and let him know that this deal is not working for you the way you thought it would. I'd try taking the tack that I'm afraid it is going to do harm to our sibling relationship and that perserving that seems far more important than continuing to try to do business together. It may or may not work.

    Good luck and keep us posted on how things turn out.

  • 15 years ago
    last modified: 11 years ago

    If it's a fixed price bid, why is he coming back to you for more money for the concrete?

  • 15 years ago
    last modified: 11 years ago

    Thanks all--

    jmphoto- I thought it would be easier for him to be the GC. The bank preferred to work with a GC, so I didn't push the issue with the bank. I thought I was helping my brother get established in this state. He just received his NC license, also has SC one. He has a full time job as buisness analyst. This is a side thing for him.

    Renovator8- Yeah, i know. He is the GC and on paper is liable for the bills. I have no problem with giving him the money to pay the subs. Besides the grader, everything else was signed by him. Not that I didn't want to sign the contracts, he just did. I was in contact with the subs and had the initial bids/contracts sent to me b/c I was the initial contact. Once we started the build, he had them to only communicate with him- which was OK with me. But, he doesn't want to show me the final contract, with the prices. I don't have a problem paying my brother so he can pay the subs. I just want to know what I'm paying.
    The problem with the contract is it's very vague. Had I known he would acted this way it would have been more detailed as I knew what I wanted. My specs were bnot on the plans or in the contract. My contract is literally 1 page long with 4-5 paragraphs. It's a basic contract that doesn't even have a termination agreement. I know it sounds stupid but once again we discussed everything verbally and I assumed I would control everything as far as price of subs/ selections of most things.

    bevangel- thanks for the advice. I will look into the lawyer for a consultation. Just hope it doesn't go that far. Luckily there is really only 1 sub. I used the same company for footing, foundation walls, slabs and waterproofing (sister company). So they are the only ones waiting on payment. As far as relationship, it has already been damaged b/c I've seen characteristics in him I didn't know existed.

    weedyacres- My point exacty. I have line items/budgets for eveything. It I am indeed over, then I can pull from something else that I can maybe downgrade- like granite. That was my plan. I allocated a miscellaneous line for these things which is part of the fixed price. As a matter of fact, I'm the one who did the cost breakdown for the bank.

  • 15 years ago
    last modified: 11 years ago

    What part of NC are you located?

  • 15 years ago
    last modified: 11 years ago

    Suburbs of Charlotte....