Floors first or base board trim?

16 years ago

We were told to put in the base board trim first in our kitchen before laying the oak floors. Is this right? Is it ok to lay the flooring first and then put the base boards in?

Comments (9)

  • 16 years ago

    Are your oak floors solid or engineered? I always advise trim and baseboard after solid wood. However, in most new construction and renovation the door installers beat me to the job and have both the door frames and the door casings installed; that requires that I undercut both the frames and the casings.

    My preference then is: Floor first...baseboard last.

  • 16 years ago

    Our floors are solid white oak. So we will wait to install the baseboards. Your advice has been great! Any other advice we should know before getting the floors installed?!

    Thank you.

  • 16 years ago

    Yes, no butt edges closer than six inches from another, no obvious "H" patterns or stair step patterns in the layout. Have your installer 'rack' the floor as it is installed. Paying attention to how the boards are placed makes a big difference in the overall result.

    Is a vapor retarder of some sort planned? If this is going to be over a crawl space, then that should be part of the installation.

    Is this a new house? Will your flooring be acclimated to the house environment?

  • 16 years ago

    Thanks for the input glennsfc. Just what I was looking for.

    I will definitely make sure the installer racks the floor. I like the darker pieces in any wood pretty much(would have loved more variation in our white oak) so I am going to try to have those pieces stand out. I'm nervous about staining them so will probably end up going natural.

    The house is not new. The wood has already been delivered. We are now in the acclimation process though we probably will have it uninstalled a little longer than the typical.

    I don't know about a vapor retarder...between the subfloor and hardwoods I assume. I should look that up. Our floors are over a finished basement..

  • 16 years ago

    Over a finished basement a vapor retarder usually is not needed. Sometimes we use nothing, sometimes we use red rosin paper, sometimes roofing felt and sometimes nothing.

    Go with what your installer recommends.

    What finishing system did you choose?

  • 16 years ago

    It is our decision whether we want water-based or oil-based (our finisher will do either) and still have not decided. I have heard the oil based stays nicer longer but I'm not sure about the ambering color? We have a saddle brown (somewhat chocolatey brown cabinetry coming in). Also, I was told that with our white oak floors the water-based may make the wood look blah or too bland.

    I am still open though. The water-based is nice that it's relatively quick.

    Again, decisions, decisions..

  • 16 years ago

    Ok, I'm bumping this way up because I have the same dilemma. We have trim carpenters out there right now installing doors (new construction) and my wood floors are at least more than a week away from being installed (waiting on exact date from them) So, my husband wants to wait on the floor trim, my carpenters don't. Also, my painter is custom staining all of the woodwork so have to wait to have him out until after the floors are in too. This is all holding up the project, but the trim may look odd with quarter round too, its 3.25 inch oak kind of scrolly designed.

    I'm pulling my hair out on this!!!

  • 16 years ago

    The flooring installers should have access to a jamb saw to cut the door casing off as needed.

    Before doors came complette in a jamb the casing trim was installed later and could eaily be cut as needed.

    Now that doors often are purchased with jambs and casing already attached together t is routine to cut them off to match the floor thickness being installed later.

    Below is a link to a large maker of undercut saws.
    They are a nifty tool for solving odd cuts in renovation and new work.

    Here is a link that might be useful: Crane undercut saws

  • 16 years ago

    You can undercut the jambs, but I prefer the baseboards sit on top of the wood floor.