Software
Houzz Logo Print
doug_gb

Master bath remodel

13 years ago

I've remodeled a kitchen - with permits - and everything
went fine - no problems with inspectors.

Now I'm going to tackle gutting the masterbath.

It already has it's own 20 amp circuit - just for an outlet.

I'm installing a new alcove bathtub, Toto toilet, sink, exhaust fan, light in alcove (damp rated), heated floor with GFCI thermostat, thermostatic Grohe valve, window.

Are there any codes/issues that I should be particularlly aware of? (Besides good workmanship and common sense engineering)

Comment (1)