Contractor Question? Does this sound right?

18 years ago

Dear Wise Ones,

I've got a situation with a contractor bid that is making me crazy and I'm hoping that the sages of this forum can tell what's what. We are working with a kitchen designer from a local kitchen store that primarily pushes cabinets. We have an approved floor plan and cabinets have been ordered. The kitchen design plan consists of a floor plan, cabinets and countertops. Beyond that, the designer has had little to say about backsplash tile, flooring or anything else, though we've been pretty clear about our style preference.

Okay, here's the weirdness: We bid the job with a construction company (GC) that is affiliated with the kitchen store (note, we aren't under any obligation to use them). We met with the GC yesterday to review the project/costs and were amazed to learn that the contractor expected us to figure out the tile order for the backsplash/walls and floors. The GC gave us an estimated square footage for the backsplash and floor but no materials list. Apparently, since we've elected not to buy the tile from the kitchen store, the contractor's position is that we should look to the people we are buying the tile from to figure out what materials we need.

I can't imagine walking into a tile store or (gasp!)HOME DEPOT and asking them to interpret our dopey floor plan -- which doesn't include a tile plan -- and figure out how much tile we need -- how many field tile ? how many bullnose? etc. Okay, so now I'm getting mad all over again.

We've had tile work done on the exterior of our house and the installer gave us a detailed materials list. For the record the kitchen store sells tile but didn't push tile as part of the design. I get the feeling that they didn't want to freak us out with a big tile expense since we're already over budget. My anger is turning into paranoia!

The primary reason we're hiring a General (at a healthy mark up which we don't begrudge them if they do a great job) is to ensure that we have a central authority -- one that is responsible for all aspects of the project. Shouldn't that encompass creating a tile plan and materials list for me?

I believe I'm dealing with reputable companies that have good reputations. Is it me or does this sound bad?

Thank you for sharing your experience.

Tina

Comments (8)

  • 18 years ago

    I'm in the midst of this now myself and to me what your GC is proposing sounds acceptable / reasonable. That's the way we're doing it: I've taken our (v. detailed) kitchen plan to the various tile places (still haven't decided which to use) and so far they're all coming up with the same amounts (which is what my husband and I estimated when we did the math).

    Early on in my professional relationship with our GC we did talk about tile choices: once he heard the tiles I was thinking of he said he wasn't going to add an allowance because of the (enormous) cost discrepancies. I appreciated that, that he'd supply the labor but wouldn't make any money off me for the tile itself.

    So I've not been through this process completely, but as of now, what you wrote sounds fine.

    With that being said, if you're having any misgivings LISTEN TO THEM. Trust your instinct and seriously think about working with a different GC. What was his response when you told him you expect him to provide all the info? How did you feel about it? It's better to take the time now interviewing away so that you have a good match with the person who will be organizing and, to some extent, overseeing your kitchen remodel. (I write "to some extent" because obviously you and your husband are the ultimate overseers.)

    Good luck, Tina.

  • 18 years ago

    howmuch are you being quoted per square foot for a backsplash?

  • 18 years ago

    I never got a tile plan or materials list from my contractor, either (I've done 3 bathrooms & a kitchen in the past year) -- nor would I have wanted to because I'd rather select everything myself. The contractor gave me drawings of the bathrooms with measurements (& the kitchen designer gave me the kitchen plan) and I took those to the tile store. Once I had selected my tile & figured out my design (which the tile salespeople helped with), then the tile store gave me a quote with recommended quantities. I then checked everything over myself -- and in every case I made some adjustments (up or down) to the recommended quantities by doing the math myself. I sent my contractor the estimates to review, but he never made any changes. By the time I got to the third bathroom, I didn't even have the contractor do the drawing because I felt confident that I could do the measurements and calculate the square footage required myself. I did go to "real" tile stores, though, not Home Depot or the like. It would have been much harder without the help of experienced and patient salespeople.

    Besides the tile, the other materials you'll need (which I learned about here!) are grout in a color other than white and matching caulk for the change-of-planes.

  • 18 years ago

    I'm with the GC. There is too much variation in tile for him to make a materials list if you are not buying from them.

    That said, before installation I would expect the GC to review the list you bring from the tile store to make sure there are no mistakes ... after you reviewed everything like hoffman said.

  • 18 years ago

    The good news is that he was clear on what he does and what he doesn't do.

    If that GC is installing the tile, then I would insist that the KD do the tile plan and sell you the tile, then both of them would be tied to the complete project.

    If your tile place makes a mistake, the GC does not want to be responsible for the lost time in reordering, exchanging, etc...

    You are unclear as to why you didn't insist that the KD plan the tile job, as well as the cabinets. Voicing your concerns would help you understand why he didn't and possibly the designer will step up to the plate and help you.

    Since you have a complete kitchen plan, the KD should be able to give you the surfaces to be covered by tile, or else any tile place can figure it out.

    I can understand your desire to have complete service on this project; why should you have the hassle .
    Good luck and let us know what happens.

  • 18 years ago

    the contractor's position is that we should look to the people we are buying the tile from to figure out what materials we need.

    Although most contractors will usually help you out just as a courtesy, he's technically right. Most tile showrooms, if you contract with them to install, will send an estimator out to your house to look the job over and figure out what's needed. I'm not even a showroom-- just a tile contractor, and if I'm called, I fully expect to have to do the same thing. That's part of what I'm being paid for. Even if your GC DID estimate it for you, I would still expect a showroom to send someone eout to cover their butts. I learned a long time ago-- never trust someone else's estimates!! :-)

  • 18 years ago

    howmuch are you being quoted per square foot for a backsplash?

    Chan123-- It all depends on where you are, but for the most part, the lowest I got up here in MAine is 15.00 a foot, just to cover the wall with tile, and it goes up from there, depending on how fancy and intricate it gets. I've been known to charge as much as 32.00 a square foot.

  • 18 years ago

    Dear Masters,

    Thank you for your very helpful responses. I called the KD yesterday (that was obvious, duh) and told her that we didn't feel we had enough detail in the plan to buy the tile. (Those mysterious corner pieces, quarter rounds, v-cap whatever, bull noses and other bits baffle me.) Anyway, she stepped up and is drawing the kitchen tile plan which is a big relief since apparently there are some quirky spots in my old kitchen that are challenging. I've already selected the tile -- Ann Sacks beveled subway tile; only 3 cents more per sf than a similar tile at Expo Home, if you can believe that -- so I'll take these plans to Ann and put myself in their hands. And we'll be taking our own measurement as a double-check. My GC, however, will be doing the installation, so it makes sense to have him review their materials list.

    Once again, thank you for the sharing the benefit of your experience and getting me off the ceiling. It's invaluable to me (and my DH, believe me).

    Tina