Owner built pool - Katy, Texas (permits required)

10 years ago
last modified: 10 years ago

Pool Build 2016 · More Info

First filed my pool permit application June 29th. Didn't receive approval until July 18, 2016. Dig on July 22nd, Rebar July 23rd.

Comments (23)

  • 10 years ago
    last modified: 10 years ago

    Here's the freehand drawing I used for bids and quotes...

    Pool Build 2016 · More Info

    July 22nd, dig

    Pool Build 2016 · More Info

    Pool Build 2016 · More Info

    Pool Build 2016 · More Info

  • 10 years ago
    last modified: 10 years ago

    July 23rd, Rebar

    Pool Build 2016 · More Info

    Pool Build 2016 · More Info

  • 10 years ago

    This is awesome! I live in North Richmond area by Katy and really want to build my own pool. Would you mind sharing your sub's info? My email is bbmcd82@gmail.com

  • 10 years ago
    last modified: 10 years ago

    Stub up guys were here Monday, July 25th

    Pool Build 2016 · More Info

    Monday evening, storm forecasted...and we have to cover - didn't get a picture of completed stub-out before covering up.

    Pool Build 2016 · More Info
    good thing - might have been fine, but better safe, than sorry...
    Pool Build 2016 · More Info

    Inspection this morning Tuesday July 26th for pressure test and steel check...gunite still scheduled for Thursday - if still on schedule after the rain. Plumber back on Friday and Electrical Saturday. Tile, coping and rockwork next Wednesday. Passed pressure test, couldn't inspect steel - too much water. Will pump out and reschedule.

  • 10 years ago

    Nice progress!

  • 10 years ago

    Well...with the flash flood rains on Tuesday before we had to leave town for funeral services, we put in a 1HP pump that also pumps out solids with a float switch attached to 2 1/2" pvc hose to try to help contain any damage...

    That's my husband, there's about 4 feet of water in the deep end. Some slough off, but no cave-in. Lots of silt.

    Pool Build 2016 · More Info
    You can see the ladder - and the water line - it had already pumped out about 10 inches in almost 20 minutes...
    Pool Build 2016 · More Info

  • 10 years ago

    Wednesday evening we returned to a yellow tag due to lack of 3" minimum spacing below rebar from silt covering up the steel. We used a hose and washed it all down to the pump and pumped it out. Got a green tag on Thursday. Fingers crossed for gunite on Friday.

    Pool Build 2016 · More Info

  • 10 years ago

    Gunite came Saturday morning. Plumbing scheduled for Monday, electrical for Tuesday, inspection Wednesday. Hopefully tile, coping and rockwork starts on Friday. Moving along...

    Pool Build 2016 · More Info

    Pool Build 2016 · More Info

    Pool Build 2016 · More Info

  • 10 years ago

    Any updates?

  • 10 years ago

    Electrical and Plumbing were completed last Wednesday. Inspection was Thursday. Tile, coping, and rock are set to start today sometime...

  • 9 years ago

    Coping today.

  • 9 years ago

    Three days of rock work, then tile

  • 9 years ago

    Decking Guys

    Pool Build 2016 · More Info

    Too much rain...again.

    Pool Build 2016 · More Info
    It rained the day they poured the deck - we had to put plastic on it. Thank goodness we were doing a spray overlay. Would've been a mess.

  • 9 years ago

    Pool Build 2016 · More Info

    Plaster work - Sunstone Superblue. These guys did a great job!!

  • 9 years ago

    Pool Build 2016 · More Info

    Filling it up on September 8th. Lots of brushing and running the pump nonstop for several days...

  • 9 years ago
    last modified: 9 years ago

    Pool Build 2016 · More Info
    The first one in!! This was during the start up. We chose to do the traditional start up so we could swim right away.

  • 9 years ago

    Pool Build 2016 · More Info

    Spray Deck Topping Was September 14th, 2016

  • 9 years ago
    last modified: 9 years ago

    Pool Build 2016 · More Info
    Spray Deck Color applied today!! I chose Acryladek with Cool Feel from Sherwin Williams and had them match it to Brickform's Oyster White. Great Color, with good neutrality...not too tan, not too ashy green - some other colors looked nearly pink next to the flagstone. And all that is left is gas meter exchange and final inspections! Yay! We made it! The rain truly held up our project. It could have easily been done in 3 weeks flat; city permitting office with it's initial delay unfortunately put us into the rain's path. Next up - putting green.

  • 9 years ago

    Looks great! Came together nicely. Keep us informed in the putting green, I plan doing one behind the pool but will have to be next year. Great weather this week to enjoy!

  • 9 years ago

    What has your cost been up to this point? We've considered, and compared, traditional gunite through a pool company, fiberglass, and DIY in ground w/ liner. But we haven't looked into DIY gunite.

  • 9 years ago

    rcush I am going to do an owner build in League City. Can you let me in on some of your subs?

  • PRO
    8 years ago

    Great job on your pool! I know you've been asked this many times over... Can you please share sub list with me: paul@crymarfinishes.com

    Also interested in a putting green, if you wouldn't mind sharing that contact as well?


    Thanks in advance,

    Paul