Okay so in the beginning phases of getting my basement finished. Got my quotes and am about to hire the contractor. Our basement has almost 9 feet from the floor to the ceiling (rafters). I want to keep/embrace this height and make sort of a loft look. So my contractor is going to pull down all the insulation (the walls will al be insulated) from the ceiling. My plan is for me to then paint the entire ceiling (rent/buy compressor/spray gun) a dark matte gray before the drywall goes up. There's not too much up on the ceiling that would be painted over, two pex plumbing lines (1 hot and 1 cold), a couple soft insulated heat/ac ducts (look like silver foil coated), a single gas line, and little electrical for the current basement lights (will get an electrician to add overhead lights). So questions:


1. Any particular type of paint recommended?

2. The mechanicals I listed that are there, any concerns with painting over them?

3. Timing, thinking to do this after the studs go up but before the drywall. What about before or after electrician comes to put in lighting (I'm thinking can lights around paremeter with a row of industrial looking pendant lights down the middle)? Initially think have hime come and put in the wiring and ceiling boxes then I paint and add the actual fixtures myself after?

Comments (13)

  • 9 years ago

    Just a couple of notes:

    I'd use only latex or acrylic paint as oil paint may damage the Pex.

    The International Fuel Gas Code requires very specific ID of gas pipes.

    401.5 Identification. For other than steel pipe, exposed piping
    shall be identified by a yellow label marked “Gas” in black letters.
    The marking shall be spaced at intervals not exceeding 5 feet (1524 mm).
    The marking shall not be required on pipe located in the same room as
    the appliance served.

    Double-check with your gas supplier to be sure this is their requirement.

  • 9 years ago

    Thanks for the advice. Yeah was planning on latex for the paint. The gas line is black steel pipe (currently has no markings/labels). Alson wondering how well paint will stay on the HVAC soft ducts, not that they ever come in contact from anything (the material is never being flexed) but they are pliable, will painter crack/flake off? I guess if it becomes issues I could box them in.


  • 9 years ago
    last modified: 9 years ago

    Benjamin Moore has a number of speciality primers for difficult surfaces. For a budget conscious reno, I was sceptical about covering a half-wall of patterned shiny tile. Worked perfectly.

  • 9 years ago

    Another question..... Obviously location plays a role (I'm in central Massachusetts), but any idea ROUGHLY on cost of paying someone to do this? I figure if I do it myself it would cost at least 400-500 to do (buy power painters, the paint itself, plastic sheeting, mask, etc etc). Plus wondering how long it would take me to do vs pay someone that could knock it out way faster than doing it myself. The finished space would be roughly 400sqft.

  • 9 years ago
    last modified: 9 years ago

    Prices are so local, just call around. Best place to find good painters, I've found, is the local pro paint store. Outside the insane big city real estate markets, I understand trade rates are more reasonable.

  • 9 years ago

    Greg, I am also in central Mass and attempting a very similar project. Have you painted your ceiling yet? Did you end up doing it yourself? How did it go? Any advice??


    Thanks!

  • 9 years ago

    Unfortunately I had to completely change up my plans. My house was built in 2011, the floor joists (ceiling joists in the basement) are engineered I-joists (https://www.google.com/search?q=engineered+i+beam&sa=X&tbm=isch&tbo=u&source=univ&ved=0ahUKEwiB7qi1ndHTAhWB4yYKHSxcDaYQsAQIPQ&biw=1200&bih=695) and in Massachusetts it's against fire code to leave those exposed. I ended up having contractor do 1/2 inch drywall ceiling (we're in the mudding/taping phase of the basement finish now).

  • 9 years ago
    last modified: 9 years ago

    Retroactive Code Enforcement of IRC 2012, 2015. I should have thought to ask about that, but I've never used I-beams. If you were building now and liked the industrial look, you could use fire-protected I beams.

  • 9 years ago

    I did something very similar in our basement. I opened up the ceiling and painted it. I moved the electric lines and HVAC to the side of the room and boxed it in.

  • 9 years ago

    Juuuust about done. Just needs the carpeting (and clean up) and we're done.

  • 9 years ago

    Wow! It looks really great. I like the colors.


    Do you have any advice about recessed lights? Did you use 4" or 6"? How many did you use and how far apart are they (from each other and from the walls)?


    Thanks in advance! We are still working on our project, since we decided to bring an electrician in to pull all the existing electrical (which wasn't done to code) and redo it all.

  • 9 years ago

    We had an electrician do all the lights outlets etc (to ensure it was to code and prevent myself from getting injured and/or burning down the house). They're 4 in. dimmable LEDs. There's 11 total for the 32x12 foot room (10 for the room itself and one for the bottom of the stairs (where the yellow wall is). They're evenly spaced apart along the 32 foot length, so rough math says 6 ft or so apart. The blue wall to gray wall is 12 feet, I'm not home but looks like maybe three feet from long walls and 6 feet between the 2 rows). We're happy with how it turned out. Originally the ceiling was going to be exposed as this thread started but firecode changed that. That back wall with the door/windows was going to be all brick, making a loft look. Loosing the ceiling meant loosing the loft look, so I didn't want to spend the money doing the brick wall.

  • 9 years ago
    last modified: 9 years ago

    Looks great.