michellebstone12

Cabinet Hardware Install

8 years ago

Help please! Big kitchen renovation in the works. It was going great, other than behind schedule. But today the contractor had his guys install the hardware on the cabinets. I'm am so upset. I held them up and showed them exactly where I wanted them. Luckily I went in when they had done the first two sets and they were completely wrong. Way too close together! I called the contractor who was pretty rude because of the cost and sent his other guy over to talk to me. Again, I showed them exactly where I wanted them, but then I had to leave. I came home to find that they had installed most of the rest of them, but again WRONG! This time they were the right distance apart, but the completely wrong height. And what's worse, they are uneven. The pull on every left cabinet is about 1/8 inch further in than the right.

So our builder is coming over in the morning but I know there's no way he's going to want to replace the cabinet doors. But I hired a builder so that it would be done right. I couldn't imagine it could be this hard for professionals to install cabinet pulls evenly, so I searched and in about 5 seconds found templates (which they did not use) and in about 2 minutes found that it's even better to build a jig to be able to quickly install them perfectly. I feel like we would have done a far better job doing it ourselves. So what do I do? I don't want the builder to lose money, but I don't want uneven pulls in our brand new kitchen. :(

Comments (28)

  • 8 years ago

    One possibility is to re-drill properly located holes. If one hole of each pair is off, you might only have to redrill one of the holes. Then, if the part of the pull that butts against the cabinet door is wide enough, it will hide the old hole wen the pull is reinstalled. However, because a new hole will be drilled close to an old one, it would be best to glue a wooden plug/dowel in each old hole before drilling anew. On the other hand, if the bases of the pulls are fairly small, the handles won't hide the re-work unless you pick out new pulls that will.

    In any case, this re-work may be beyond the skills of the incompetents who installed the pulls in the first place. Sorry, that's the best I can suggest short of replacing the cabinet doors.

    michellebstone12 thanked kudzu9
  • 8 years ago

    In principle,I agree with kudz but can't help but wondering if the problem is as serious as portrayed. 1/8th" doesn't sound like it would be noticeable. Perhaps a picture might change my mind.

    michellebstone12 thanked klem1
  • 8 years ago
    last modified: 8 years ago

    Pictures of what they did?

    It is up to the designer to provide a diagram showing hardware placement if that is important to you. Not just show someone who may not speak English well.

    Written documentation required.

    The holes can most likely be repaired and redrilled. It depends on what they actually did. Which no one knows without pictures.

  • 8 years ago


    These are the first ones that were far too close together. When I came back home these additional holes were drilled plus the damage.

  • 8 years ago
    last modified: 8 years ago

    These are the ones that look off center to me. The builder is saying they are only 1/16 off. Is that normal and within an acceptable range of error? I can see it easily and I'm not generally picky or hard to please. But maybe cabinets are usually off a little?

    Also the bottom of the pull was supposed to be 1" up from the bottom of the door (I held them up where I wanted them and explained clearly) But a different worker drilled the holes and instead centered the hole 1" from the bottom.

  • 8 years ago
    last modified: 8 years ago

    Pull back for a big shot from actual viewing distance. Doors and drawers are often not 100% level and plumb until the final adjustment at the end. It may be possible that could be contributing to the perception. Or, his installers could just be hacks, and there are other issues that you aren’t aware of.

    michellebstone12 thanked User
  • 8 years ago

    Substandard workmanship. I shudder to think what the rest of the work is like.

  • 8 years ago


    Here is a more distant view. They do look noticeably off to me. I'm being told that it's not visible or its just the light...

  • 8 years ago


  • 8 years ago

    michelle-

    That's totally unacceptable. It looks like they just eyeballed it, crossed their fingers, and drilled. Those are so far off that the fix I originally suggested above is unlikely to work. Whoever did that had no idea what they were doing. And I see no way to patch properly so the damage won’t be noticeable when the handles are properly located. If it were me, I’d be expecting new doors, paid for by the contractor.

    michellebstone12 thanked kudzu9
  • 8 years ago
    last modified: 8 years ago

    The one door above with all the holes, cannot be repaired, so that is one new door. I would ask for all new doors, and then, I wouldnt let them put on the hardware. Yes, it is noticable, and yes,it is way more than 1/16 off. 1/16 wouldnt be all that noticable, and I might let that go. If they havent done all the doors, dont let them touch the rest. It is the contractors responsibility to order and pay for new doors, and I wouldnt worry about him losing money, he should have been there supervising, or at least making sure he had someone doing them, that was capable of doing them right.

    michellebstone12 thanked cat_ky
  • PRO
    8 years ago

    Those butt doors don't seem to have enough gappage to open without rubbing against each other. Where did he source the cabinets? In house custom?

    I'm also seeing a few issues in that backsplash.

    How did you come to hire this particular contractor? Does he carry the required workman's comp and liability?

  • 8 years ago

    I don't know if your hardware has an install problem, but if mine do coming up in early summer 2018, then all friggen heck will break loose.

  • 8 years ago

    The Cook's Kitchen
    They ordered all the cabinets on cabinets.com. They seem to open and close alright.
    I've not had too many problems with their work, but the sub they used did to a TERRIBLE job on the ceiling. I'm really not happy at all with that. I'll post pictures. But I've thought the backsplash looked good. I would love to hear your concerns! He is a licences contractor and has a lot of jobs going right now.

  • 8 years ago


    This use the other thing I am unhappy with. I can actually see the trowel marks in the ceiling texturing. It looks like a checker board to me.

  • 8 years ago


    And this is where it meets the existing ceiling. They said they would carry the new texturing into the existing and level it of gradually. I wish I knew why they didn't at least try to match the existing ceiling. So frustrating.

  • 8 years ago

    Ouch. I hope you havent paid for this stuff, because, if it were mine, the ceiling would be redone, by someone that knows how to do it. If you havent paid, do not pay, until things are done correctly.

    michellebstone12 thanked cat_ky
  • 8 years ago
    last modified: 8 years ago

    I'm working on deep breathing to try to reduce the stress. Do I need to fire the contractor now that we're almost done?

    the two top pulls are a full inch closer to the right side. I measured and it's a full inch.
    This was drilled high then patched in the face. I'm losing my mind. Three drawers are like this (holes or screws coming out the top of the box.) Now I'm worried about every single thing they've done...

    If only being weeks behind schedule were our biggest problem...

  • 8 years ago

    Losing your mind is understandable. I know some teenagers who could have done a better job.

  • 8 years ago

    Yikes. Good luck.

  • PRO
    8 years ago
    last modified: 8 years ago

    I would not be happy with an import cabinet source for the project, or the labor that placed it in the home, and then hacked it up. Too many red flags on too many things.

    Getting replacement parts from an import line is excruciatingly difficult. The contractor may have to buy all new cabinets again to get replacement doors. On a turn and burn project like he did here, that is not likely to happen.

    I’m sorry, but you may want to get out your contract again and go over it with your lawyer.

  • 8 years ago

    They are hacks / idiots / hammer mechanics.

  • 8 years ago

    Mouth breathing corner standers and cheepchinesecrapola cabinets. What could go wrong? I’d bet they were the low bid, and it was self designed, with no KD involvement.

    Because no KD would work with these idjuts, or put those cabinets in someone’s house. KD’s actually have a Professional Duty to not do harm. Just like a Dr.

  • 8 years ago

    Okay, we have it worked out. The builder is mortified and amazed that his guys did such a crap job. He is ordering new doors and will be installing the hardware himself. I'm willing to live with the position not being what I wanted as long as they can make them even which he feels confident they can.
    We have been working with a designer and this builder wasn't the low bid -- but his bid was competitive. It seems that for some reason they just screwed up badly on this.


  • 8 years ago

    Dont pay them any more money. I would also have them stop working. On the picture above, your countertop, looks raised in the corner too.

  • PRO
    8 years ago

    Agree with everyone above.

    It is not just the pull install that is the issue.

    the counters

    the backsplash

    and when you discussed with him about the pull placement and they still installed then wrong then they will have to order new faces for all, if they refuse then you will have to take them to court.

    It is not acceptable.

  • 8 years ago

    In like 5 minutes they could have made a template from a scrap of cardboard. Totally unacceptable.