Cost to stub in all utilities for future ADU during a new construction

7 years ago
last modified: 7 years ago

I'm building a home on raw land in western Washington so the home will have a well, septic, propane. During construction, how much will it cost to have these utilities run 20-30 ft away from the house and 'capped off' at the location of a future ADU, probably a little 500-700 sq ft. manufactured home? I'm contemplating doing this vs. adding an attached ADU for 50k-65k to cut down on mortgage total and add in the ADU later after my budget is settled in. The house will be 3 bedrooms 2 1/2 bath and the future ADU will be 1 bath 1 bed so the septic will need to accommodate for 4 bedrooms during construction. Maybe an RV could be attached here later instead of ADU as another option? I under stand it varies by location but Ill be happy even with a plus or minus 30% just to get a good ballpark. Will I need to run these utilities to a concrete slab or can they just be run up to raw land and future slab location?

Comments (11)

  • PRO
    7 years ago

    Ask the builder............nobody can answer

  • PRO
    7 years ago

    This would have had to be done at the time of the utilities being done and the septic field is determined by the main dwelling so the ADU would have had to be planned where the septic field could work for both dwellings IMO pretty late in the game if the permits are already in place . This will be a start over with a real plan for both units

    454321 thanked Patricia Colwell Consulting
  • 7 years ago

    Yes I would be starting from scratch and securing the permits and sizing the septic for the eventual total 4th bedroom with 1 bed ADU just to stub in all utilities and add ADU within a couple years. If having this done at same time as main home construction I have a hunch it may not be a big deal and could just be like 5k or less to run a septic tube, electric cable, gas line, phone/internet, water line...

  • 7 years ago
    last modified: 7 years ago

    I don’t think you understand how septic works. Poop has to flow downhill. Math calculations. You can’t “just” hook up a second line to the tank, even if the tank is large enough. Because the math has to work. That all has to work as a site master plan, from a professional, before any septic permit is issued. If the ADU position, size, and relationship to the house via a survey was not factored in when the septic was permitted, you will need that site plan and to get the septic repermitted.

    There’s nothing worse than poop that doesn’t flow downhill.

  • 7 years ago

    It's not just downhill, as septics can be pumped - quite common where our lake house is. However, they no longer allow separate buildings to be connected to the same well and septic. Older ones are grandfathered, but not new construction.


    You need to check with your local authorities. They might allow a MIL unit in the same building.

  • 7 years ago

    Ok thanks everyone. Sounds like I quite possibly would need a second smaller septic installed for the detached ADU. I have a feeling it will be easier to just build with the attached ADU at time of construction not to mention more efficient in several ways. Ill have to explore local zoning laws.

  • PRO
    7 years ago

    You still will have to adjust the new building s septic . This is not like adding an extra bedroom , kitchen and bath later it all needs to be planned now.

  • 7 years ago

    Your site plan is crucial; exact placement of both dwellings must be coordinated with the septic tank and drain field. Siting the drain field is the most troublesome aspect...everything depends on the soil's ability to "perc".

  • 10 days ago

    Stubbing utilities now is usually cheaper than trenching later, but on a well and septic lot the septic is the deciding factor, not the pipe.

    Talk to whoever is designing and permitting your septic before anything else. A system is sized by bedroom count and sited for its drain field. If the ADU is not in the design now, you may need a second system later, and there may not be room for one. Ask whether they can design it now for four bedrooms with the future unit's location shown.

    For a future manufactured home, ask your county what foundation they require. Many places want a permanent foundation for it to count as an ADU, which affects where the stubs come up.

    Practical tips: run conduit for power rather than wire, so you can size the cable later; mark and photograph every stub with measurements; and check whether your power provider wants a separate meter. On an RV: most counties do not allow one as a permanent dwelling, so check before you plan around it.

  • 10 days ago

    T.J. Stack 7 YEAR OLD POST. Would be certain long since either finished or forgotten about.