Software
Houzz Logo Print
webuser_438920380

Got land, now what?

6 years ago

I have 11 acres at my leisure that needs to be cleared and prepped. What should I do on my own before starting contractor/builder talks? I am meeting with the county planning office tomorrow for a site assessment.

Comments (13)

  • 6 years ago

    In my area of Central Texas, my architect recommends a soil test, first and foremost. I also plan to hire a geotechnical engineer to advise on septic and well placement (my sister failed to do this, and ended up with a $12,000 dry hole in the ground where she was hoping her well would be), and possibly an arborist to walk the property to identify which trees should stay and which can go. :-)

  • PRO
    6 years ago
    last modified: 6 years ago

    Lots of homework:

    --Find sources for construction financing and permanent mortgage

    --Check zoning for residential regulations

    --Verify utilities that are available; whether perc test, well and septic are required and procedures for them

    --Begin search for experienced residential architect and general contractor

    --Start preparing needs and wants lists


    Search archives here for information about designing and building a custom home.

    Good luck!

  • 6 years ago

    In some areas the Council of Governments employs Geospatial Information System (GIS) folks who map out the boundaries for phone service (which companies provide it), electric service, special tax situations, building/zoning restrictions, and many other things that are signficant when a business is looking for a new location. I don't know if a homeowner can access the data, but it seems like it would be very useful if you want to know more about your parcel of land.

    Bruce

  • 6 years ago
    last modified: 6 years ago

    I met with the county planning office today. Based on watershed protections, I have to sub develop the 11 acres into 5 plots max (flexible development subdivision). i have to meet with a lawyer & surveyor next week. Thanks for the tips.



    One question: Impervious surface... that doesn't include the house correct?

  • 6 years ago

    It seems odd to me that they are forcing you to subdivide which will increase (potentially) the impervious. (It’s possible I didn’t understand that this was your initial intent. Also, in my area, every one of the subdivided plots will need perc tested and passed for septic. Your costs will certainly go up!

    Before I read the subdividing part, I was going to give the advice to go spend some time on the land. Walk it. Learn it. go out in the rain. Watch storms come through. Watch the sun rise and set. You get the idea.

  • 6 years ago

    To clarify, we are not being forced to subdivide but there is a density bonus that we would like to take advantage of.


    Currently, the land will be surveyed (recombination) in about 3 weeks and then my lawyer will get the easement situation resolved. How soon should I start reaching out to contractors?

  • 6 years ago

    I think subdividing can be simple or complicated. The first issue would be access - are you talking 5 nearly evenly split lots along a road? Or are you needing to build a road?

    That would seem to me to be 2 completely different cans of worms.

    It is never too early to meet with contractors. Their timelines can be months or years. Very rarely would they be ready to start a project tomorrow.

  • 6 years ago

    Without the subdividing the lot is limited to one plot per 5 acres. With the density bonus we can do one plot per two acres. The expectation is for other family members to take advantage as well. Ultimately the perc test will tell us how many plots we can actually get right?

  • PRO
    6 years ago

    Impervious surface usually does include the house. It's a good idea to confirm definitions with whoever is concerned with impervious surfaces to be sure you understand exactly what they consider an impervious surface and how to calculate it.

  • PRO
    6 years ago

    I agree with Summit Studio Architects you definitely have to confirm what % of the lot allowed to be covered with impervious surfaces.

    Common impervious surfaces include, but are not limited to, roof, walkways, patios,

    driveways, sheds, paved areas, etc, basically everything that prevents the natural infiltration of stormwater.

    There are ways to reduce that lot coverage % by using a pervious surface material that allows infiltration of water like porous asphalt or concrete, permeable pavers, modular grid

    pavement, etc.



  • 6 years ago
    last modified: 6 years ago

    Septic questions are fairly local. We have an island on septic. I share a tank with a neighbor and the field is on another lot. Other areas with limited land have raised beds. I believe they call them peat systems. There are limitless possibilities but options vary on local jurisdiction and soli condition.

    There are lots of ways to deal with waste. Some are way cheaper than others. Our across road option was about $18k (8 years ago) and much of that was the $10k or so to get across the street.

    Our land is on a plot that was subdivided into 7 parts. I think there are 3 or 4 fields in the subdivision. We share with one neighbor and I know another 2 share a field. The other 3 I am not sure what they do. We happen to like and respect our neighbors but sharing a tank and field could create issues.

  • PRO
    6 years ago

    You have a surveyor on board so I'm assuming you have a civil engineer? Typically they understand the development and manage the approval process.