We are renovating a small bathroom that involves replacing all existing materials but keeping everything in the same place.


The existing one piece acrylic tub/surround will be replaced with new tub and tiled walls to the ceiling. There appears to be a leak that has turned the wallboard to mush. The house was built in 1995 and I don't believe the wallboard above the surround is waterproof material. It is currently painted, not tiled.


I know I need a plumber and a tiler and planned to use a family member handyman to install the vanity. I've contacted one tiler who said he will demo everything and will level the floor before tiling. Counter to be installed by fabricator. Maybe an electrician to replace the bathroom fan and lighting or possibly that could be DIY? To minimize electrical cost I'll select lighting that can be remounted at the same connection as the existing. What type of work would require the electrical to be upgraded to current codes? I am willing to make things work to avoid this expense.


Any other sub?


Who actually prepares the tub/shower space with waterproof materials to accept the new tub and tiling? Will any of this work overlap between subs such that one could blame the other for things not working out? Is there any "construction" that is required that the tiler or the plumber wouldn't do?


Does any of the plumbing need to be accessed from the wall behind the shower such that I need a different sub to repair?


Bottom line, do I need a general contractor? I have no general knowledge that puts me in a position to be our own GC. On the surface, however, it seems the job responsibilities are fairly independent of each other with little coordination required. I do recognize there is coordination with the plumber coming in and out of the project to turn off water for demo, install tub and tub/shower fixtures and finally connect sinks.


Any opinion or advice is appreciated!



Comments (4)

  • 6 years ago

    In your situation, I'd hire a General Contractor. The most important sub-contractor to that GC is the tile professional IMO. Don't let the GC hire an inexperienced tile "guy." You should have a certified, experienced tile professional on the job. That person generally handles all the prep, waterproofing, and tiling. The GC will decide the allocation of tasks between the different sub-contractors. Here are two place you can look to find a certified tile pro in your area. Often times, really good tile pros are not certified by these organizations, but they are still experienced a good tile pros. In that case, you'll need to see their previous work, and ask them to explain to you how they do waterproofing. Make sure that your contractor spells out that "all work is to be done in accordance with manufacturer's instructions, local building codes, applicable TCNA, ASNI, and industry standards."

    https://www.tile-assn.com/

    https://www.ceramictilefoundation.org/certified-tile-installer-cti-program

    https://www.tcnatile.com/products-and-services/publications/218-english-publications/188-handbook.html


    nehome thanked AJCN
  • 6 years ago

    The question you should ask is whether you have the experience to know how something needs to be done and how to evaluate the work?


    Do you have the experience to order everything that is necessary and to coordinate that everything is on-site and is correct and as it should be.


    Do you have the ability and time to coordinate the workmen and supervise them - and as stated - make sure they are doing their job correctly.


    If not, your best move is to hire a GC. If you hire a great GC, the odds are that the workmanship will be first rate and everything will be done correctly. He will take responsibility for ensuring that everything is ordered and is correct and that the workers are there when they need to be.


    In my jurisdiction, bathrooms need to be inspected multiple times. It is the GC (with the appropriate tradesperson) who will meet with the inspector. A good GC will know exactly what is necessary to get something approved because they have gone through the approval process multiple times.



    nehome thanked Helen
  • 6 years ago
    last modified: 6 years ago

    I agree that the tile installation is probably the most critical, although replacing an old cast iron tub is also not an easy task. You may not need a permit if all plumbing fixtures are staying in the same place and the wall framing is not changing; however, every city has different rules.

    There are old and new methods for prepping and waterproofing walls and floors for tile, and the new methods work a lot better. My preference for a new installation is to use the Schluter products to waterproof and prep both walls and floor, but there are other companies with equivalent products.

    Its also important to get a good carpenter in there to look at framing before the tile prep, because he/she can ensure walls and floor are as plumb and level as possible. Tile installation goes much more smoothly if the installer is not continually having to adjust for bad plumb and level walls and floors. Sistering a few studs or joists to level things up is very easy when its already open.

    Bruce

    nehome thanked Bruce in Northern Virginia
  • 6 years ago

    Thank you for the feedback. Bruce your mention of making sure walls and floor are plumb was my concern. I was unsure if that would be the job of a tiler or carpenter. We had connected with a tiler and a plumber (independent of each other) about a year ago that were highly recommended on our town FB Pinboard (then we had to delay the project). I found it reassuring to actually talk with the person doing the work rather than the contractor.


    I found that with another renovation with a GC that we still had to be familiar with how things needed to be done in order to evaluate the work. We were monitoring the work and checking in with the workers directly. I can't say that the GC reviewed the end result each day for accuracy. Several times we brought something to the GCs attention that if not identified by us after reviewing that day's work, would have meant a bigger disaster. However I can see that we would become the mediator with independent subs if one subs work impacted the others.


    What I may do is ask the tiler or the plumber (we liked both) if they work works with a GC when there are multiple subs involved.


    Thanks for the food for thought!