Search results for "Commitment programs" in Home Design Ideas
Find the right local pro for your project

We raised a few sections of front walk to bring it back up to its original level and to get the step back up to code. Your step should be between 6-7 ¾ inch to pass code. Job cost roughly 200 dollars.

A close-up of the frameless sliding shower door shows 3/8" clear tempered glass running on a polished chrome header bar with round roller hardware. The minimal hardware keeps the focus on the marble-look tile behind it and gives the shower a sleek, hotel-style finish.

Exterior detail of the Corten cladding and aluminum-clad windows. The hopper-style windows tilt outward at the top — a contemporary ventilation strategy with the cleanest possible exterior sightlines. Each window sits flush within the steel facade.
81
















