Software
Houzz Logo Print
bomber095

Anyone else's peppers behind schedule?

18 years ago

Yesterday, I noticed the first flowers on my peas. Talk about behind schedule! We're usually eating peas by now, but I think the wet spring combined w. the near 100° heat earlier this week has put things on hold.

Even still, my peppers have no flowers at all! The tomatoes are bursting w. blooms, but the peppers have nothing. They were planted in mid-May (as usual), and usually, we have blossoms by now. The plants are definitely taller, just no flowers.

Anyone else feel the pain?

Comments (29)

  • 18 years ago

    I have some small flowers on my green & orange bell pepper plants, I think they are right on schedule though.

  • 18 years ago

    My plants are small but setting on flowers. We've had cooler weather than usual, lots of rain, and lots of overcast days. This does not make for great veggies; however my tomatoes look great with lots of tomatoes setting on. Some are the size of golf balls already. I didn't grow good arugula. They were leggy and bolted right away.

  • 18 years ago

    My peppers are way behind too and I'm having the exact same problem with the snow peas. With this past heat, the snow peas slowed way down in flowering but the peppers have been loving it and trying to make up for lost time. The tomatoes seem to be on time but they got hammered with the last round of thunderstorms so we'll see what holds. Hopefully this week of more moderate temps in this area will get the peppers flowering.

  • 18 years ago

    I have flowers on my pepper plants, tomatoes, and even some fruit (yikes--glad I only got 2 to try) on my ground cherries. Even have some flowers on ome of the pole beans already.

    My peas are lush and viny from all the cool weather, and have finally flowered. Some have podded and some are ready (the baby and I have been snacking on the Sugar Ann snap peas this morning), but I think peas as a whole are gonna be a bust for me, as the vines are already dying from the high heat we had earlier last week.

    ....anyone else have no roots on their carrots yet in my zone? I have some tops but no root to speak of yet.

  • 18 years ago

    My Peppers are so far behind I'm beginning to believe I put them out to early for next year.
    jim

  • 18 years ago

    I don't have any flowers on my pepper plants, one tomato flower and 3 blooms on my snow peas. Cukes are struggling, but the zucchini plants - eightball - are HUGE.

  • 18 years ago

    No flowers as of yet either. But I have noticed that the plants have shot up something fierce - even larger now than they were last season when they were setting fruit.

    The only fert so far is a bit of fish emulsion, something I did not use last year.

    Too bad it doesn't work on kids.

  • 18 years ago

    I won't let my bell peppers out of the cold frame. 46 degrees this morning. Daytime high temperatures still in the 50's. They have begin to flower and are touching the top of the cold frame. They'll have to come out into the cold, cruel world soon.

  • 18 years ago

    My pepper plants don't seem like they're doing anything either, except I did notice that there is a flower bud on one spindly plant. I hope the plant does some major growing before that bud becomes a pepper or the weight of it will break the plant. I don't think my pepper plants appreciated all the cool wet weather we'd been having but now that it's warming up I hope they will take off. A few of my cherry/grape tomato plants have nice blossoms, so that (at least to me) is a good sign. And we're having our first-of-the-season snap peas with dinner tonight. Yay! :^)

  • 18 years ago

    i have a few little peppers on my chili peppers..a few flowers on my pablano's..

  • 18 years ago

    Well, I'm ready to call our peas a bust. I finally have some sugar snaps and the Little Marvels are flowering (btw -- the blossoms are a beautiful magenta), but I planted them all in the tomato bed, figuring by the time they were done it'd be time to plant tomatoes. Poor tomato plants are hanging out getting root bound while I wait for peas.

    I've never been particularly good with peppers, but squash (yellow scallop, rampicante, romanesca, golden zucchini, eight ball) and cucmbers (lemon & Boothby's blond) are crackers.

  • 18 years ago

    Mine look like I planted them yesterday instead of a month ago. :(

  • 18 years ago

    whynotmi, I was going to say the same thing. They look healthy, but they've hardly grown or changed at all since they were planted 3 weeks ago.

  • 18 years ago

    Peel, that is exactly the state of my peppers too! They look fine, just havent gotten any bigger in almost 3 weeks.

    Everything else is growing steadily though and few are looking fantastic: broccoli (ones that havent been eaten by rabbit yet GRRRRR!!), tomatoes, zuchs.

    My cukes arent growing a whole lot either but they are doing more than the peppers.

  • 18 years ago

    I did get a late start at hardening off the peppers this year so I am definetly at least a week behind schedule but the whole garden is showing signs of growth and I am enjoying snap peas every day. I pull off all of the buds on my pepper plants right up to the point of planting out then when I am done planting out I make sure that all the buds are gone and give them a heavy shot of nitrogen then I leave them alone to do what they will. I just got the last of the peppers in the ground about a week ago and already have loads of buds and small pods. In about 10 days I will load them up on phosphate and very little nitrogen 10-54-10. Here are a few pic of the progress although it is not very noticeable in the pics there is some change since plant out.

    June 7th
    {{gwi:63376}}

    June 13th
    {{gwi:63377}}

    June 1st
    {{gwi:63378}}

    June 13th
    {{gwi:63379}}


    Dale

  • 18 years ago

    My dear Gussie, Hell of a garden!!! You are serious, Dale. Makes me want to dig up some more yard. Lawn is useless anyway. Well done! Did you make your own cages? I bought the heavy ones at Wal Mart, but dang, they want over $5 apiece for those babies.

  • 18 years ago

    Yes, aulani I did make my cages from the crw I bought a 150' roll and made 15 cages and still have plenty left.

    Dale

  • 18 years ago

    bswampy and others, have you seen any growth of your plants yet? I think mine may have grown an inch or so, but still no noticeable changes. Very strange!

  • 18 years ago

    peel, have you given them any ferts lately?

    Dale

  • 18 years ago

    Yes, a slow release fert last week. We've had so much rain here lately, not sure if I should give the plants another dose.

  • 18 years ago

    The ones I have in the garden are getting greener and look to be growing but they're still slow while the habaneros and thai in pots on the deck have grown at least a couple of inches and are almost as big as the ones in the ground. No flowers of any kind though - gardening does teach patience.

  • 18 years ago

    "gardening does teach patience."
    You can say that again!

  • 18 years ago

    Most of my peppers survived over the winter because it was so mild outside here in southern California and are looking healthy and almost all have fruit and flowers on them already. In fact I may start harvesting some in the next few days. Peppers are a perenial and will grow into a large bush given enough time.

  • 18 years ago

    It looks like they might be trying to put out some flowers, but good lord, are they slow this year! Wow........

    Swampy, my cukes are growing more than the peppers also

  • 18 years ago

    Mixed bag with my peppers, some have flowers, some don't look like they've grown at all. Same story with my tomatoes, this weather has everything confused. My cukes got their leaves munched by something a few weeks ago so they're just little bitty vines right now...but flowering! The eggplants have finally started growing so I'll see what happens in the long run. Lots of lettuce though.

  • 18 years ago

    Peel,
    My peppers have finally started growing taller but still haven't seen any flowers. I should picking the first round of snow peas this afternoon....

  • 18 years ago

    Mine have also been slow. I bought 6 plants from Burpees. They were delivered May 2nd and with our rather cold spring I didn't plant them until Memorial Day weekend. They have grown a little bit since then. Eggplant are also slow.

    My squash, cucumbers and tomatoes are doing very well, however.

    I also grew leaf lettuce for the first time this year. It has been a real treat.

  • 18 years ago

    This is interesting. I have mixed results. This year I planted sweet bell peppers, sweet banana peppers, anaheim, poblano, cowhorn, cerano and senoritias. The sweet peppers with the exception of the cowhorn have grown but are still only 1' tall. I have harvested 2 small bells but they were from blooms on the plants when they were planted. The other peppers are 2'-6 tall and growing more each day. They will all catch up and start making lots of peppers.

    Juast my results.

    Carl

  • 18 years ago

    My hot peppers are well behind normal schedule. They should be flowering by now. I've got to mix up some Epsom salt water & possibly get some blood meal to heal them up, then they should start producing shortly afterwards. At least two of them are already budding but because of the nutrient issue of container gardening, the buds are not doing well. I'm hoping I can save the plants & get some peppers off them. On a good note, my green bell & orange bell pepper plants are budding & some even flowering already! yay! :)

    Here is a link that might be useful: {{gwi:63375}}