dingoaint

Do I need a GC if...

17 years ago

If I'm not changing any electrical, plumbing, or walls and my cabinet maker does the install, do I actually get much value from a GC?

I'd have to contract out for floor and counters and things won't demo themselves but is it really worth GCing? It almost seems like a small job once the cabinets are taken care of. What am I missing?

Comments (4)

  • 17 years ago

    I am not hiring a general contractor. Figure first I will get the demo - then I will get the electrician and plumber in - I have some plumbing problems and want to update 2 prong outlets to three prong and put in a new outlet, and put in new lights - install appliances.

    Then I will get the floor people in, then the painters. Then the cabinet install, then the counters - sink, faucet, garbage disposal.

    I figure I won't schedule the plumber and electrician until the demo is done. Won't schedule the floors until they are done. Seems simple. I don't know.

  • 17 years ago

    Fori
    What are you doing? is this a total gut?
    New cabs, new flooring, is the flooring level?

    ? Sink,paint, appliances, counters, new light fixtures, any added fixtures, under cab lighting etc..

    Difficult to say unless you give what the scope of the job is - & does your town require permit for the work being performed?

    A GC oversees all the subs, & is ultimately responsible for the subs and their work - If there is a mis measurement and a range doesn't fit for instance that is on him/her to fix it - He is required to pull the permit etc., If a tile floor is laid & cracks 2 months later that is back to the GC

    Contractors generally "prefer" working w/a GC - who is responsible for proper scheduling of the subs - Things have to be done in certain order - You can't install a fridge that has an icemaker w/o a water line running to it
    That is not to say a homeowner can't do it - They just have to be on the ball with what has to be done, when & by whom - which honestly sounds easier said than done

    I could go on.....

  • 17 years ago

    In my experience doing all the GC'ing myself (carpentry, electric, plumbing as well as doing floors/paint myself), the main difference will be in time. It will simply take longer to finish if you oversee it all yourself.

    You'll inevitably forget something or something won't go correctly, and you'll need to have someone back in, delaying someone else, and then that person won't be available for another week or month. There will be inevitable holdups when specialty items have to be unexpectedly replaced or ordered online from afar. This all tends to have a domino effect. Also, contractors will tend to prioritize other jobs where they are working for someone else, a GC upon whom they'll depend for future work, for example. So you might find yourself last in line now and then.

    At first it might get frustrating to realize that often you need each trade more than once in the course of the project, say, an electrician has to come in at 3 different points. He'll come in, pull one wire and say OK, call me back when the carpenter is finished with X. And then you wait 2 weeks for the carpenter to be free, etc etc... You'll simply have a new learning curve with each step of the project, never having done any of it before.

    Now, this didn't bother me too much since I had somewhere else to live (and cook) and was grateful to be getting it done at all, but your mileage/patience may vary.

    It really helps if your contractors know one another, as they did in my case. They will have worked together on other jobs and there will be less friction a la "I can't do xyz because the stupid carpenter prepped abc incorrectly/not how I want it prepped." There are certain baseline standards that everyone will adhere to (if they're any good at all), but as with anything else, each tradesperson has their own preferences on how to get it done.

    Plan as much as possible in writing! And let everyone know as much of the total picture as possible, so that they can help point out any glitches from their trade's perspective.

    Good luck!

  • 17 years ago

    We just finished a kitchen "update/makeover" rather than a true remodel; kept our cabinet boxes but had new doors/drawer fronts made & installed by cabinetmaker; new countertops & undermount sink which was installed by granite fabricator and my husband found a plumber to hook the sink lines back up (probably could have done it himself actually). We did not add anything electrical, and did not tear anything out except old countertops and previous island but there was no difficulty with those things. It really depends on the scope of your project--but it sounds like you MAY be able to do it w/o GC.