Software
Houzz Logo Print
pete_p_ny

Need some suggestions...

19 years ago

Any suggestions. I have a joist in the middle of the drain. I expected this because the old tub which had the drain on the opposite side from the original installation in 1963, had a hunk of the joist knotched out to accomodate the drain. It is recommended to knotch joists. I do not think I can change joists either, tons of gas pipe, water, etc in the way underneath.

{{!gwi}}

Also, do you need to set acyrlic tubs in cement...or can they just lay on the subfloor. What actually holds them in place? Do they just kind of stay in place after the wonder board is installed and the tiles are set?

Comments (18)

  • 19 years ago

    A short new section of joist might be able to be 'sistered' onto the existing joist in order to take the load when this one is notched.
    The cement under an acrylic tub is to prevent the tub from drastically flexing and distorting when it is full of water and body.

  • 19 years ago

    Also, can the drain be directed to the long side of the tub instead of the front of the tub? This way, I do not have to notch the entire joist the foot or so to get to the front of the tub. And if it can be diverted to the side of the tub, how would it get connected to the contraption (not sure of the name) that goes vertical where you have a latch to close the drain to fill.

  • 19 years ago

    May be there is some sort of part made for this? This must be fairly common of an issue I would guess.

  • 19 years ago

    To clarify the picture above...the joist runs the length of the tub from front to back, not side to side.

  • 19 years ago

    You may have to re locate your tub?

  • 19 years ago

    I think you need to call in an architect type and redo you structural members. Sounds expensive.

  • 19 years ago

    Sections of floor joists are often cut out to create a "plumbing pocket". (Or for ceiling fans or pull-down stair cases or whatever.)

    The joists on either side of the cut joist need to be doubled up and doubled framing is installed perpendicular to the doubled joists, called headers, creating a box where the plumbing will be. The ends of cut joist are then attached to the headers, usually using joist hangers. Many books show this procedure.

    Bill

  • 19 years ago

    "The joists on either side of the cut joist need to be doubled up"

    When the joists on either side are doubled up...how long is this doubled up. I do not need to go from the main beam in the house to the outside wall do I? This would be impossible to do. Or do I just need to double up in the boxed in area?

  • 19 years ago

    I can't answer your question. I'm not qualified and I don't know what you've got going on with your framing now. How much beefing up of existing joists depends on what you've got.

    A link or 2 to help clarify, (then you might want to hire someone) :

    http://books.google.com/books?id=PvE_aiQAQSEC&pg=PA154&lpg=PA154&dq=framing+joist+header+%22cutting+a+joist%22&source=web&ots=zyZ35jvQdG&sig=VLjj8ZHbRl5CZX-oqHXNUtFv0Ts#PPA154,M1

    http://www.terrylove.com/forums/showthread.php?page=3&t=11159

  • 19 years ago

    If you just notch the area where the actual drain is, that would not be too bad and that is what I would do, but because you have to go the entire distance to the front of the tub to connect the waste pipe to the trap and overflow pipe you will be notching out a foot or so because the joist is running lengthwise.

    Can you even knotch out the trap area...this would be a pretty good chunck of joist, no? How many inches are you talking?

    May be there is a special drain for this? This must be a common issue? If you use a drain water stop that is located at the tub drain flange area(the twist up/down type), is there an overflow that can be installed with some 45 degree elbows to get it past the joist and avoid the traditional vertical up down overflow? Is this doable? You can then clear the joist where the trap would require extreme notching.

    Is the overflow required, maybe just notch a bit and go towards the edge of the tub and install a trap?

    Not sure, but just thought I would throw it out.

  • 19 years ago

    This is what I was trying to explain...not sure if this is legitimate plumbing though...

    {{!gwi}}

  • 19 years ago

    That may be a code violation

  • 19 years ago

    Why would that be a code violation, does it really matter the overflows kicks to the side, as well as the drain.

    Sounds like a good idea, please advise. I have a similar issue.

  • 19 years ago

    There should already be an inch or two of vertical clearance between the top of the joist and the underside of the tub.

    By code a joist MAY NOT be notched in the center 1/3 of the overall span. The outer 1/3 area on either end of the overall span may be notched to a maximum of 1/6 the vertical height of the joist. (I.E. A 2x6 could be notched 1" deep).

    Using a sched.40 glue in type Waste & Overflow a notch should create enough vertical clearance to squeeze the tub-shoe under the drain opening.

    Turn the tub shoe so the drain line will run at a 45deg angle to the top of the stud. Attach a short length of sched.40 PVC pipe, then install a 1/8th bend (DWV grade 45deg elbow) and run the drain line parallel to the joist.

    Install the overflow to the tub in the normal manner. Install a short nipple of sched.40 pvc then a 1/8 bend and turn the line 45degs to a second 1/8 bend to get the required offset.

    Install another section of PVC down to the baffled Tee from the Waste & Overflow kit to complete the offset waste & Overflow you require.

  • 19 years ago

    What is a baffled T?

    Is this the piece with the plunger (?) to stop the water? And if it is, will the method you described above to kick the line to the side, can be used with a plunger, or do I need to use a stopper at the tub shoe? Will the linkage from the overflow work with some 45 degree elbows?

  • 19 years ago

    If you make an offset you won't be able to use the lever type stopper...solution..install a toe kick or lift & turn stopper in the drain.

  • 19 years ago

    Thanks...lazypup!
    I was in Lowes this morning and picked up a rough in kit that had the schedule 40 overflow and drain as well as the temporary parts to hold things in place until the final trims are installed. Needed to get a Tee and some straight pipe. I also noticed a "cable driven" unit that has an external cable connected to the overflow and tub drain, but this seems like it may cause issues over time.

  • 19 years ago

    If you bought a glue in type Waste & Overflow it should have a "Tub shoe" , "Overflow Head" and the "Tee" in the kit. All you will need to make the offset would be some 1-1/2" schd 40 PVC pipe and three 1-1/2" PVC 1/8th bends plus primer and glue.

    The waste and overflow kits come with a stopper..You can select which type you want. Level type, cable type, toe kick or lift and turn..In this case you would want to select a kit with a toe kick or lift and turn type.

    The kits will have the complete trim pieces too.