I have a large 35'x20' deck about 3'-4' off the ground that is in really sad shape. I just bought the house and do not have the money to replace it, but am seeking advice on the best way to extend it's life for another 2 summers before I do a complete replacement. Here are a list of my problems.

1) Foundations seems to have settled on the middle beam and outer beam causing a gap to open where the deck adjoins the house. It is sagging about 2 inches in the first 10 feet and another 4 inches in the last 10 feet.

2) There is some rotting of a few of the joists where they are connected to the beams.

3) The ledger is rotted in a few places and was not adequately secured to the concrete block foundation.

I know this sounds bad, but I just don't have the money to replace this deck right now.

Here are my thoughts:

The piers consist of 4x6's and are spaced every 9'. That seems like too much and was thinking of supplementing the middle with some additional piers set on a small pad of concrete with a precast pier (full foundations at the mid pier would be difficult to dig with the deck in place). Then I was hoping to jack up the outside beam and place it one about six new piers in hopes of easing the lateral pressure on the ledger due to the sagging deck.

For the joists I was planning a installing a sister joist adjacent to the problem joists. Would it be better to install a joist hangar for the sister joist or just to toenail into the beam?

I was planning on installing some additional lag bolts in the ledger to better attach it to the concrete block foundation.

I have also toyed with jacking the middle beam up as well, but thought I would leave this alone and just reinforce and live with the 2" sag over this section.

I know this is not the best solution, but I will have to live with it. My other option, is do nothing and cross my fingers, but some action seems necessary.

Thanks,

Riles

Comments (4)