Software
Houzz Logo Print
christineny_gw

Need Expert Advice on Electric Box Replacement

18 years ago

I really need some advice. Our electric meter box located outside my home is completely rusted. We were told my electric company that it is dangerous and needs to be replaced. We called two electricians for estimates. Both agreed we needed it replaced, with estimates around $900.00.

Both electricans wanted to see our breaker box, which is located in our basement. We have a Federal Pacific Box. They both independently said that these boxes don't trip and need to come out. My home was built in 1975 and we have been in the house for 16 years. The electrican I felt most comfortable with said that he could replace the box for another $900.00. I asked him what he would put in and he said a SuperiorD box, which is the top of the market. I have no clue if that is a good replacement unit or not.

My husband called his brother, who has a PHD in electrician engineering and he said that the problems associated with the Federal Pacific Box is nothing but rumors and there was only one lawsuit against the company. He said for us not to change out the box.

My questions are would you change out the box? We are planning on not moving and staying in the house. Is $1,900 a fair amount for replacing it? Also is SuperiorD a good product? Any advice you can give would be appreciated.

Thanks

Comments (6)

  • 18 years ago

    1) Yes, Square D is a very good company.

    2) Your brother-in-law is not so bright giving out such advice. Actually it is not his fault, asking an EE about electrical contracting is like asking a foot doctor why your ear hurts. EE's generally have no more clue about the contracting end of things as anyone else.
    In the US FPE panels have a LONG history of problems and are regarded as dangerous.

    I was in a very similar situation. My home was built in 1975. we had just purchased in 1993. It also had an FPE panel. I am a licensed electrical contractor. I replaced that panel within 5 days of moving in.

    Price is a subjective thing. Location is a BIG factor. In any case, make sure you are having a 200 amp service done, and if so $1900 is a most reasonable price.
    If it is 100 amps and they intend to replace it with 100 amps do NOT do it. Upgrade to 200 amps. It is not worth spending that kind of money for a bare minimum sized service.

    Google "Federal Pacific electrical panels" and tell us what you find. Hint: go to the first link.

  • 18 years ago

    I agree with petey racer 100%. We are electrical contractors in Dallas and we will not do work in a home with an FPE panel unless we replace it with safe, up-to-date equipment. We always update customer's service to 200 amps. By any chance do you also have aluminum wiring?

  • 18 years ago

    "My husband called his brother, who has a PHD in electrician engineering...

    More important is does he have a PE?

    The FP boxes have a number of problems and finding out it yours will fail usually occurs after the fire.

    And I have a PhD and a PE.
    The amount of labor just to replcwe the rusted metal is almost exactly the same as installing a new box.
    You have to remove the entire 'guts' of the panelboard to put it into a new enclosure.

    If you want teh ultimate PhD problem, Fins woodworking used a professor at Virginia Tech to answer a question about motor efficiency ad life on 120 V vs 240 V.
    The academic answer is 'No difference'.
    Assumed was that the voltage would be the exact correct value at the motor terminal.
    The extra voltage drop in the 120 feed to the motor will of course prolong startup an lead to additional heating of the motor, wear on the starting switch, etc.
    Experience with reality can be a tough teacher.

  • 18 years ago

    Hi:
    Thanks for your advice. I will have my husband read your comments. I know the quote was for 150 amps. Should I ask for 200? How much will that up the price? Is it really necessary?

    Thanks again!!

  • 18 years ago

    The difference between 150 and 200 amps is almost negligible as far as the labor and material goes. Maybe$100-$200 TOPS.

    150 amps is a useless service size IMO. There is absolutely NO reason to go with 150 amps.

  • 18 years ago

    Ok. So I will call the electrician and tell him that I want 200 amps instead of 150. Thanks everyone for your advice. I will be having this done within the next few weeks.

Sponsored
High Point Cabinets
Average rating: 5 out of 5 stars21 Reviews
Columbus' Experienced Custom Cabinet Builder | 4x Best of Houzz Winner