We'll be having a new house built; using a GC. Will have a draftsman do the final drawings, including an electrical plan. We know most of what we want and where. I understand that we will probably make some changes when we do the preliminary walk-through with the electrician, and mark those on the plan. And we will be asked to sign off on the changed plan.

Dumb question: how do we get a copy for our own records of the changes that are agreed to and signed off on?

Comments (9)

  • 19 years ago

    mark them on your copy of the plans and have him sign those as well.

  • 19 years ago

    davidandkasie: Well, Duh. I had a senior moment there. Thanks.

  • 19 years ago

    If you've got any specific requirements, then say "I want a recepticle -here-, 5-6 from the west wall and 4-0 from the floor", mark it on the plans, and make sure its in the right place before they slap up the drywall.

  • 19 years ago

    Let me make a suggestion to you...if you are folks who like to put up outdoor lights for Xmas, have him install the circuits and receptacles for that. You will never regret the money you spent. I have friends who have done that and it is so nice for them. They have separate switches for receptacles under the eaves, etc. Everything is GFI protected.

  • 19 years ago

    I'm printing all this out for reference.

    I didn't really know how the installation was done. From noffo's comment I guess it is done in 2 stages:

    1) receptacles, switches, wiring gets installed before the drywall. So it's attached to the studs.

    2) after the drywall, the electrician cuts through the drywall, exposing the wiring boxes and then finishes up and attaches the cover plates.

    How close am I? I sure hope everyone isn't as clueless as me.

  • 19 years ago

    pretty close. the drywallers are suppsoed to cut out for all boxes, but most of the time they miss 1 or 100 at a job! i remember once we were running the phone lines and ethernet at a new office building. we put in boxes and conduit stubbed up above the level of the drop ceiling for these. when we came back to run all the lines, every single box, all 125 of them, was covered. i had to go around every where and find the boxes and cut them out. the electricians had the only copy of the plans tha thad the locations on them, and naturally they were gone to a new site when we came back on. good thing i had a wire snake, cause i just sharpend the point, bent the end a little, and shoved it down so it broke thru the rock. then i could cut out the boxes. every room had them in different locations, some were 18" from the floor, some were 5 ft up.

    usually the wiring and the boxes are run prior to drywall, while the fixtures,switches, and recept are done AFTER the drywall. the wire MUST be inplace first though, or the inspector will make you tear out the sheetrock so he can see that there are no hidden junctions.

  • 19 years ago

    davidandkasie: thanks for explaining the sequence, I'm learning. BTW, our exterior walls are gonna be insulated with Icynene spray foam. It's supposedly the last step before drywall. I understand it's not a problem for the wiring. Hope it doesn't create any problems for the final electrical work. Or that the final electrical work doesn't disrupt the Icynene. We're paying a fortune for it; it needs to do its job!

  • 19 years ago

    make sure the electrician knows this is going up, and not just verbally, put it in writing and have him sign off on it. he must get the rough in inspection done prior to the wiring being covered.

    ANYTHING AND EVERYTHING you wish to change needs to be in writing. if you tell any contractor to do it differently from what is drawn on the plans, and he does not, it is your word against his written instructions in court. understand?

  • 19 years ago

    davidandkasie: Got it! I try real hard to stay out of court. Our GC is doing this build on a fixed price contract, so that will encourage documentation of changes, I think.

    Will write the Icynene thing into the specs. Our GC has worked with Icynene before, so he knows the drill.

Sponsored
Snider & Metcalf Interior Design, LTD
Average rating: 5 out of 5 stars25 Reviews
Leading Interior Designers in Columbus, Ohio & Ponte Vedra, Florida