Add On Cost Questions

19 years ago

I'm nearing the end of a kitchen remodel and have a contract with an electrical company with the work being performed by a licensed master electrician. The work is fairly extensive and to date they delivered on what they said they were going to do with a few nits here and there, but nothing major. Now that we're at the end there are a few issues I'd like your input on:

1. They installed a series of low voltage 3 inch recessed lights using halo H39LVICAT fixtures. One was to go over the sink area and would have its own separate switch, but the area rough out had not been completed when they were installing the other lights. They agreed to do it on their next trip out. In the meantime we decided that we really wanted a 4 inch recessed fixture using an incadescent 50W flood. In fact, we decided we should actually have two of them. The electrician agreed it was a good idea. When I asked about price, he said it wouldn't be two bad because the two 4 inch fixtures together were less expensive than the 3 inch since we didn't actually require an IC/LV fixture. When I got the bill the net add on was $259. This just seemed to be way out of line especially considering I had some credit for the fixture exchange and no wiring had to be run - the fixtures are about 36" apart with nothing between them. I was expecting a charge more like $125. Am I being unreasonable or is this a fair charge(we're in Houston, TX).

2. We were also doing an outside project adding a summer kitchen (actually a winter kitchen since we're in Houston) and I decided to have three additional 20A circuits run out to that area. It was a long run, about 125 cable feet from the box to the junction box where the wires exited the house. From the junction box they were to run two circuits to the kitchen area about 3 feet underground and then wire up a warming drawer, a disposal, provide two GFCI outlet receptacles and a switch for a light and fan. The third circuit was for a future lighting system. They said I needed a new subpanel because even though it looked like I had space in the main box, I had used 41 of the 42 available slots. The total charge for the work including the new subpanel was $1750. I agreed to this and the work was done. Since then I have mapped out my cicuit box (took about a half a day to identify everything) and counting the double poles as two slots, I can only account for thirty nine breakers, including the two 50A for the subpanel. In addition, one 20A breaker has no wires going to it and for the life of me, there are two breakers that I have no idea what they control. I have had them off for three weeks now and have not had anything that didn't work. That aside it seems like I should have four available circuits. The subpanel has only the three new ciruits. Assuming there really are four available circuits, it would seem that I really didn't need the subpanel after all. While this may have been an innocent oversight on the electricians part, do I have any recourse with them? As I recall the cost for the subpanel and work was approxmately $500 - give or take a $100.

3. For the three outside 20A circuits they actually ran a 12/3 and and 12/2 wire instead of three 12/2 wires. They left the 12/2 wire in the junction box, its for a future lighting system and did the rest of the wiring with the 12/3. They said they did this to save a few bucks and that it was perfectly fine to use the same neutral for both circuits. Is this OK?

Apologies for being so wordy. I look forward to your input.

Cheers,

Larry

Comments (11)

  • 19 years ago
    last modified: 11 years ago

    Can't comment on the first two but #3 is fine. It's called a multi wire branch circuit.

  • 19 years ago
    last modified: 11 years ago

    Sub panel was required. He cant fill a panel & most electricians will hope to leave more than just one empty stab for future use. There's code that says he cant fill it up, have to leave some room for future.
    You'd be kind of upset if a few days after job done if you wanted to add an snow cone machine or something that required a new circuit only to be told you need another subpanel.

    Over sink lights,, ask or express your concern about that price. You'll probably get a reasonalbe explanation.

  • 19 years ago
    last modified: 11 years ago

    Mikie
    What is the code that says you can't fill a panel up??

  • 19 years ago
    last modified: 11 years ago

    The code applies to new installs and upgrades only. For Canada you must leave two unused slots for future use in a main panel. The two unused slots are for a future subpanel or two additional 120V cc'ts or one 240V cc't.

  • 19 years ago
    last modified: 11 years ago

    I think we are talking about USA codes so if you have one I would like to know because I am unaware of any such code which limits the number of breakers you can install in a panel.

  • 19 years ago

    As far as the US is concerned you can fill the panel to the maximum it is rated to hold (and no panel is rated for more than 40). No requirement to leave any empty. If you want a subpanel for expansion later, you just move a couple of circuits to the subpanel to make room for the feeder breaker.

  • 19 years ago
    last modified: 11 years ago

    "As far as the US is concerned you can fill the panel to the maximum it is rated to hold (and no panel is rated for more than 40). "

    In Canada you can get residential panels with up to 64 full size slots. They're long and heavy!

  • 19 years ago
    last modified: 11 years ago

    I am guessing that 40 circuit maximum is right beside the you can't fill it up requirement in the code, and the original poster imported their panel. Why do we just keep offering these statements of fact that have no basis in facts. Why do we continue to offer this information without checking first. Even though it's free, incorrect information is usually worth even less than that, because it can end up costing the person that is relying on it.

  • 19 years ago
    last modified: 11 years ago

    Actually the limit is 42 overcurrent devices in the NEC (408.15). It should be considered good workmanship that the electrician opted for a subpanel instead of filling up the existing panel. You would have had to pay a lot more to get him back to do it at a later date.

    The charges do not seem too out of line, but you do not mention where you are, so it is hard to say "too high" or "great deal" since prices can vary greatly with location.

  • 19 years ago
    last modified: 11 years ago

    Thanks everyone for your responses. In regards to the cost question #1, it took about 30 minutes to install the extra fixture. Talking with them yesterday, they are now emphasizing the service side of the business and have changed their pricing model to use "Service Unit" pricing. Service Unit pricing means they charge a set rate to install a certain type of fixture which includes not only installation but also analysis/diagnosis time and essentially drives the price up. They also reserve the right to charge more because of difficulty with the installation. Actually, I understand this last caveat because there can be significant problems they have to deal with. However, this type of pricing is not very effective on a large project. In my case, they were finishing up a $7K project and the change was pretty simple so I can't imagine why it would cost me $259 net and why they would jeopardize the on going relationship when I've spent close to $10K with them over the last three years and have a couple of more projects left to do. Apologies for the "rant and rave".

    In regards to #2, the sub panel being needed or not needed, I would have preferred to be given an option - "you've got room now, but you'll be at the limit so you may want to go ahead and do it now. If you want we can do it later, but it may cost more." - It just bothers me when I find out later I had other viable options that were less costly and I wasn't given the opportunity to make my own decision.

    Once again apologies for the ranting and raving.

    Cheers,

    Larry

  • 19 years ago
    last modified: 11 years ago

    The "Service Unit Pricing" sounds similar to auto repair shops using "flat rate". I think unit pricing or flat rate can be fair. They set the price on what an average job will cost. In calculating an "average" job some jobs go quickly and they make lots of money and some take longer and they don't make so much. Personally I don't think it's fair for someone to bill using Unit Pricing or Flat Rate and then charge extra because the job took longer. I'll bet that if the job went very quickly that they wouldn't have reduced the Unit Price.
    I think it's pretty short sighted for a business person to try to get every penny they can from a good customer. If you look around in almost any business, you will find that the businesses that succeed are the ones that treat people in a fair and friendly manner. I was taught that to be successful "Always give the customer a little more than they expect." In your case I think they could have charged something like $25 for the extra work. The profit from your past and future jobs and from friends you recommend would more than make up for the few dollars they might lose.