mariamc1578

Plumbing for a separate garage

9 years ago

We have a house with a separate garage which was finished a year ago. The plans indicated a living space above the garage to be finished in the future which would include a bathroom. Our builder understood that we would be completing this space ourselves a year or two after the main house was complete. When are the plumbing lines to the house and garage usually run and who does that work? The plumber who does the plumbing for the interior of the house or someone else? I ask because we have since had the garage plumbed and although there was water and waste stubs in the garage slab, there seems to be no water flowing to the water line. When should the water lines have been T'd off for the garage and who typically does that work?

Comments (7)

  • 9 years ago

    This should have been in the contract with your builder. Is there a shut-off valve somewhere to the garage? Was there a water line from the house to the garage run underground?

    You need to ask your builder this.

  • 9 years ago

    I have! I think it's something that was just missed and everyone is trying to put the blame on someone else. The plumber says he doesn't run plumbing outside the house, the builder says the plumber should have done this.. I'm trying to find out from a neutral party what should have happened and who should have done it.

  • 9 years ago
    last modified: 9 years ago

    To answer your questions, there is a shut off valve in the garage. No one seems to know if a line was run from the house to the garage underground. It's a little hard to tell because of the heat tape and insulation, but this is the line that the rough-in plumbing is tied to. When the plumber went to turn the water on (green valve) no water was flowing to it.

    This was a different plumber from the one who did the work originally. I have been in contact with the original plumber tho. He doesn't recall and lives about 1 1/2 hours away.


  • 9 years ago

    The answer is that your GC is responsible for the work the plumber does or doesn't do.

    If that work was ever to be done at all it should be part of your contract.

    If that's not spelled out in the contract, look to see if it's in the plans.

    If it's not in the plans, then you don't have a lot of legal ground to stand on other than "it should have been connected if it was stubbed out".

    The plumbing may be there, just not turned on in the house. If I had plumbed a garage like that, I'd have shutoffs in the house.


  • 9 years ago

    Well, that's unfortunate. Assuming this was in the contract with the G.C., then it's his responsibility. It appears there was miscommunication between the G.C. and his plumber. I would be talking to the G.C. I hope things work out.

  • 9 years ago

    Thanks for the advice. The oversight on this job was a joke and we have had many problems like this. It's very frustrating.


  • 9 years ago

    GC's mark up any subcontract, and there's a reason they do. Besides the coordinating, etc. they have to be responsible and provide high level oversight.
    Your contract is with the GC, not the plumbers. The plumber's contract is with the GC, not you. You need to deal exclusively with the GC.