mom2emall

were we overcharged or what???

18 years ago

We just got an above the ground swimming pool. We needed to get an electrician to run electric from our basement to the pool pump (about 35 feet). It had to be grounded.

I was mentioning to a friend from work what we needed done and she offered up her husband who is a contractor and work is slow now. I thought we would get a decent deal, but he charged us $900!! I think that is too much. Any ideas??

Comments (13)

  • 18 years ago

    Did the wiring need to be trenched underground? What part of the country do you live in? How long did it take him to do the job? Is the pool 35' from the house or was the total distance of the wiring 35'?

    I'm just curious what you thought it was going to cost.

  • 18 years ago

    I am also curious as to why you think you would get "a decent deal" just because your area is supposedly slow??? A contractor has to charge what he has to charge.
    Maybe $900 IS a "decent deal".

    When I tell folks it will typically cost around $1200 to have a spa hooked up I get all sorts of reactions. Meanwhile they had no problem dropping $5000-$6000 for that new spa.

    I have the same questions as Leevin.

  • 18 years ago

    Did that include the cost of the materials? Wire isn't cheap and neither are large sized GFCI's.

  • 18 years ago

    I do confess that for years I charged a bit more per hour for work on "luxuries" than for basic stuff for the obviously poor. My earnings balanced out. Changing out perfectly good light fixtures for fancier ones is an example of "luxuries". Pool is another. Depending on circumstances, the trench alone could cost $300.00. Inspections perhaps $50 to $100. Inspections would require opening the trench one day, filling it on later day. Extra trips, etc. $900.00 might not be excessive.

  • 18 years ago

    The total distance was 35'. Yes it had to be trenched. We live in the midwest. We paid for inspections in our town. He did not have to register in our town to work because we told the town we were doing the work ourself. I have known the girl from work for years and our children play together often. I have babysat her kids for free at times. Thats why I thought we would get a good deal...not because her husbands work is slow right now.

    He did have to do the work over a 2 day period because of inspections. Materials cost $260. The rest was labor expenses, that was why I felt we were overcharged. He was only here maybe 3 hours each of the 2 days. So that is a big hourly labor charge I think??

  • 18 years ago

    Well if he had his own trencher or had to rent one, that could be 100 to 150. That leaves $500. That could be a bit high, but remember when someone has their own business, that is not their take home salary. Some of us have shops/offices, licensing fees, insurance, company cell phones and trucks, and if we are lucky we give ourselves a paid vacation like everyone else :) yeah right. If you want cheaper, you would need an electrician doing it as side work, that would of cost you $500 max. If this "contractor" is just what he is called, a contractor, he shouldn't be doing the job anyway. Unless he holds an electrical license. I often find very expensive work that was done by great "contractors" that does not meet code and is not correct. But at least there was an inspection so he must know electrical.

  • 18 years ago

    Well my friend from work made it sound like this was going to be a cash side job for her hubbs. I thought that was why we said we were doing it ourself on our permit. We were saving him the money of registering to work in our town and the other expenses of reporting income from this job. Besides giving us the receipts from the store showing his expenses for materials we got no receipt for the job. So I am assumming he is not counting this job on his taxes.

  • 18 years ago

    Well I would of first asked what his hourly rate was or had him give a price on the job. Guess you can't always assume someone isn't going to raise their price up when they have the opportunity.

  • 18 years ago

    This is a good example of why price is something that should be discussed in advance. It's also the reason I try to avoid doing work for "friends". Do your normally question what the manager of the grocery store is earning or ask if your doctor is reporting all of his income?

    You thought you'd be saving a few dollars and maybe you did or maybe you didn't. Call it a lesson learned and move on.

  • 18 years ago

    Plumber here estimated me $25 to $35 per foot for about 35 foot of sewer line replacement. It's an easy dig, should be no roots so probably be the lower end.
    The pvc that goes into that trench isnt very expensive but that trench sure is. Its not a deep trench either, 3 foot max.

  • 18 years ago

    Probably 90 percent of people (other than those who are contractors or electricians) would say that you were (A) overcharged,(B) what, or (C) both. Without seeing the site and job particulars it is hard to say.

    A good rule of thumb is if you think you were overcharged, sleep on it-if you wake up feeling that you were overcharged, you probably were. It is almost never advisable to authorize a job without discussion of the cost thereof.

  • 18 years ago

    Folks better get it into their heads that contractor's prices will only be going up, and they will be going up at a rapid rate.

    Overhead is going through the roof for everyone, but contractors are especially hard hit. Two things; insurance and fuel, are becoming unreal.
    Material costs are also increasing at an unbelievable rate.

    A job that was $500 less than 5 years ago is now in the $700-800 range.

  • 18 years ago

    I just replaced 2 ballasts for a customer. He lived close, so I walked over to remove the faulty ballasts, and then rode my bike (bicycle) to HD to get the replacements, instead of driving to the wholesaler who is far away and charges more than HD anyways. I only charged him $50 labor for everything. It took about 1 hr total including the trip to HD. He was happy and I was creative in not spending more than I had to.