Basement Remodel
Client wants to remodel and finnish a walk out basement with a full bath, kitchen, bed room, living room, mechanical room. The 200 amp Main breaker panel is full as well as a 100 amp sub panel mounted to the left of the Main panel. Both original panels need numerous corrections.
It was determined to remove the original 100 amp subpanel and increase the space from 12 circuits to 24.
It was determined to remove the original 100 amp subpanel and increase the space from 12 circuits to 24.
Project Year: 2017
Project Cost: $2,501 - $5,000