This project was within a condo building with strict noise and time restrictions set by the the building managment.
I kept noise to a minimum by over tiling the wall and floor tiles, this also saved on demo costs.
Everyting went to plan with timing and budget. This project took 10 days to carry out by myself, this includes bespoke shelving and a barn door.
I kept noise to a minimum by over tiling the wall and floor tiles, this also saved on demo costs.
Everyting went to plan with timing and budget. This project took 10 days to carry out by myself, this includes bespoke shelving and a barn door.
Project Cost: $5,001 - $7,500