Removed existing 8x7 garage doors, trim ,siding, center column and framing. Temporarily supported load bearing steel beam and second floor walls. Installed new LVL headers, repaired concrete and framed the wall and door openings. Trimmed opening with PVC, installed new wall sheeting and reinstalled...