Centennial RD
Residential remodel of (2) existing bathrooms (hall and master) to include removing and altering existing walls. Main bath will be replaced using existing tub with shower. Master bath to replace existing single vanity with double. New engineered flooring throughout upper level, replace all existing doors and baseboard.
Project Year: 2019
Project Cost: $50,001 - $75,000