Dina2Decor Construction & Interior Design
5 Reviews

Complete Modern Master Bath & Tub-to-Shower Conversion

"This complete bathroom remodel in San Marcos features a high-impact tub-to-shower conversion, transforming a cramped footprint into a luxury walk-in space. As an expert San Diego bathroom contractor, we managed the full technical scope—including a professional hot mop waterproof base and upgraded in-wall plumbing for a dual multi-head shower system.

The design showcases a modern transitional aesthetic with floor-to-ceiling marble-look porcelain tile and a trending charcoal vertical stack tile accent wall. We refreshed the existing space with a custom vanity update, premium gold plumbing fixtures, and new quartz countertops. Whether you are looking for a master bath refresh or a full structural reconfiguration, this project demonstrates high-end craftsmanship and functional modern design.

Common Project Questions
1. "I love this look, but is this your signature style or can you do other designs?"
I don't have a single "signature" style because my goal is to bring the best version of your taste to life. Whether you have a clear vision or need me to help you figure it out, I design and build professionally to meet your specific aesthetic and functional needs. This project is a reflection of this client's unique style, not mine.

2. "How did you manage to make this bathroom look so much larger?"
The biggest change was the tub-to-shower conversion. By removing the bulky bathtub and installing a custom walk-in shower with floor-to-ceiling marble-look porcelain, we opened up the floor plan. Using a charcoal vertical stack tile also draws the eye upward, making the ceilings feel higher.

3. "What are the benefits of the 'Hot Mop' method you used here?"
In San Marcos and throughout San Diego, a hot mop is the most reliable way to waterproof a shower pan. It involves multiple layers of hot asphalt and felt to create a custom, seamless seal. It’s a "behind-the-walls" detail that ensures your remodel lasts for decades without leaks.

4. "Did you have to move the plumbing to add the extra shower heads?"
Yes. We performed a full internal plumbing upgrade to accommodate the dual multi-head system and the new gold fixtures. Moving plumbing inside the walls is a major part of a "complete remodel," and it’s what allows us to truly customize the shower experience for the client.

5. "I’m overwhelmed by choices—did you help with the material selections too?"
Absolutely. I provide a full design-build service. I guided this client through choosing everything from the quartz countertops to the patterned floor tile. My job is to handle the technical work while making sure the design process is stress-free for you.

6. "How long does a complete bathroom transformation like this typically take?"
A full gut-remodel involving structural changes, hot mopping, and custom tiling usually takes 3 to 5 weeks depending on the complexity. Because I handle both the design and the construction, we are able to keep the project moving efficiently without delays between different contractors.
Project Cost: $25,001 - $50,000
Country: United States