First Floor Bathroom Remodel
Total Project Budget: $25,000 *
*This will vary based on your SPECIFIC layout, options, and requirements
Remodel of this Clintonville, Ohio 1st floor Bathroom (Columbus, Ohio)
Bathroom Design: Scott Hall Remodeling
Bathroom size: 7.5 ‘ by 8.5′
PROJECT HIGHLIGHTS:
1) Complete tear out of bathroom.
2) Plumbing – convert tub to shower, HansGrohe Plumbing fixtures in shower and at Vanity Area
3) Onyx Collection White Gloss Onyx Shower ZERO CURB - shower is same height as bathroom floor
4) Custom Vanity, Recessed medicine cabinet, and mirror
5) Toto Comfort Height Toilet with Soft Close Seat
6) new lighting layout adds much more light: new can lighting in ceiling
7) Multiple Grab Bars
8) Porcelain Tile Flooring
9) Panasonic Exhaust Fan
10) Bench Seating in Shower Area (Onyx Collection)
11) Completely Frameless 3/8″ glass doors with Enduroshield Protection on the Glass
12) Wood baseboards
13) Paint
*This will vary based on your SPECIFIC layout, options, and requirements
Remodel of this Clintonville, Ohio 1st floor Bathroom (Columbus, Ohio)
Bathroom Design: Scott Hall Remodeling
Bathroom size: 7.5 ‘ by 8.5′
PROJECT HIGHLIGHTS:
1) Complete tear out of bathroom.
2) Plumbing – convert tub to shower, HansGrohe Plumbing fixtures in shower and at Vanity Area
3) Onyx Collection White Gloss Onyx Shower ZERO CURB - shower is same height as bathroom floor
4) Custom Vanity, Recessed medicine cabinet, and mirror
5) Toto Comfort Height Toilet with Soft Close Seat
6) new lighting layout adds much more light: new can lighting in ceiling
7) Multiple Grab Bars
8) Porcelain Tile Flooring
9) Panasonic Exhaust Fan
10) Bench Seating in Shower Area (Onyx Collection)
11) Completely Frameless 3/8″ glass doors with Enduroshield Protection on the Glass
12) Wood baseboards
13) Paint
Project Year: 2014
Project Cost: $10,001 - $25,000
Country: United States