Forestville Kitchen (summer 2017)
Before photos and during construction progress.5-1-2017 New windows get larger. New wiring for under cabinet lighting as well as inside cabinets that have glass doors and shelves. Blocking added to hang cabinets better than existing. Add water supply for pot filler over stove as well as water and ice in refrigerator.
Drywall begins. This week painting, than floors get refinished prior to cabinet installation. New peninsula will have small auxiliary sink for prep cooking and double as bar area for making luxurious drinks. Additional dedicated circuits added for outlets, dishwasher, refrigerator, wine cooler, lighting, etc.
6-20-2017, Next phase, countertops, Tile backsplash, install lights inside glass door cabinets that have glass shelves and under counter lighting.
Drywall begins. This week painting, than floors get refinished prior to cabinet installation. New peninsula will have small auxiliary sink for prep cooking and double as bar area for making luxurious drinks. Additional dedicated circuits added for outlets, dishwasher, refrigerator, wine cooler, lighting, etc.
6-20-2017, Next phase, countertops, Tile backsplash, install lights inside glass door cabinets that have glass shelves and under counter lighting.
Project Year: 2017
Project Cost: $50,001 - $75,000