Formation Metalworks
2 Reviews

Handrailing remodel

Client wanted to replace existing wood railing with a modern designed steel railing. Chose 1-1/2” steeltube framing with 5/8” steel tube infill. Finish coat is a satin blackpowder coat. Wood posts replaced with 4 x 4” steel tube, railings mechanically fastened to eliminate onsite welding.
Project Year: 2018
Project Cost: $7,501 - $10,000