Brunaugh Construction & Design LLC
10 Reviews

House Addition

This was completed just before Christmas on a 3 month start to finish schedule. Project consisted of a Master Suite that is tied into the original house through an existing spare bedroom that was converted to a sitting room off of the new Bedroom. The Master Bathroom has a beautiful feature of floor to ceiling cultured marble that flows into the shower and built in whirlpool tub. Marvin Windows and Doors were used to the rear of the addition leading to the new raised covered porch. All materials, finishes, and details used were intended to match the existing house as close as possible to make it look original to the house.