Sidewalk snowmelt system
New sidewalk and drop-off area snowmelt system for a Senior Center in Acton, MA. We mostly used 5/8" PE-RT tubing, but with one sidewalk measuring 180' in length (from the manifold location), we stepped up to 3/4" PE-RT for this area (400' maximum circuit length).
Project Year: 2017
Project Cost: $25,001 - $50,000
Country: United States