Small bathroom designed by SJS Construction Associates.. We removed all the drywall, and subfloor (raised foundation) added insulation to all walls, replaced new subfloor with 3/4 plywood. Removed all plumbing due to pitched venting pipe in plumbing wall that required wall to be 2X6 framed. ...