St Johns River Dock Repair

This dock was twisted and damaged by hurricane Irma and the owner was told the entire dock would need to be replaced. We were able salvage most of the existing piles and re-level and repair the sub structure and were even able to salvage a large portion of the existing deck boards. The areas that could not be salvaged were rebuilt with marine grade lumber and in the end the customer was pleased with the finished job and was able to save a lot of money which made him even more happy!
Project Year: 2017