Tavernier Remodel
This property was dated, had not been renovated since the 90’s. The client's wish was to keep the rooms light and bright, with a Mid Century, modern twist. This was accomplished with 2 months of prep work and 5 months total for completion.
The drab blue carpeting was removed and porcelain hickory honey floors laid throughout, pulling each detail together.
The kitchen cabinetry was replaced with driftwood floating shelves and marble countertops. It was kept light and bright with pops of color and an eye-catching palm feature wall. Touched off with classic, brass hardware throughout the home, and drop pendant
light fixtures.
The basic bedroom was updated with Twine Blush Grass Weave Wallpaper and exquisite luxe, rattan, drop lighting fixtures to provide an extra design feature instead of an ordinary table lamps
on the side tables.
The uninspiring bathroom vanity was replaced with a stunning, Louela blue vanity with a marble top, and an accent wall of gold starbursts graphics behind it.
The client was extremely satisfied with the interior design project.
The drab blue carpeting was removed and porcelain hickory honey floors laid throughout, pulling each detail together.
The kitchen cabinetry was replaced with driftwood floating shelves and marble countertops. It was kept light and bright with pops of color and an eye-catching palm feature wall. Touched off with classic, brass hardware throughout the home, and drop pendant
light fixtures.
The basic bedroom was updated with Twine Blush Grass Weave Wallpaper and exquisite luxe, rattan, drop lighting fixtures to provide an extra design feature instead of an ordinary table lamps
on the side tables.
The uninspiring bathroom vanity was replaced with a stunning, Louela blue vanity with a marble top, and an accent wall of gold starbursts graphics behind it.
The client was extremely satisfied with the interior design project.
Project Year: 2019
Country: United States
Zip Code: 33070