Transitional Kitchen & Bathroom Remodel
The master bathroom was dated and the use of a busy marble was overwhelming. The redesign of the layout of the bathroom and change to neutral materials provided a much needed feeling of serenity.
The kitchen was an easy facelift. Knotty alder cabinets were stained a darker color on the perimeter and the island was painted and glazed. A new cabinet was installed in place of wall shelves to provide a spot to get the microwave off the counter top. Lights and the island and dining room were changed as well as a new back splash.
The kitchen was an easy facelift. Knotty alder cabinets were stained a darker color on the perimeter and the island was painted and glazed. A new cabinet was installed in place of wall shelves to provide a spot to get the microwave off the counter top. Lights and the island and dining room were changed as well as a new back splash.
Project Year: 2016
Project Cost: $75,001 - $100,000
Country: United States