Streamline Interiors, LLC
47 Reviews

Two Phase Kitchen Update

Although the client did not like the existing cabinetry their budget would not allow for cabinetry or flooring to be replaced right away so this project was done in two phases. Initially, the cabinetry was enhanced by adding crown molding and hardware. Changing the appliances was absolutely necessary. Counter tops were selected that complimented the existing cabinet color and stainless steel appliances. The glass tile back splash is the show stopper of the kitchen. The design allowed the existing cabinetry and flooring to work until they could be updated.
Project Year: 2019
Project Cost: $25,001 - $50,000
Country: United States