Walkways
City Hall Paving Brick are mixed with an older version that was in the original walkway. Landscape Cobblestone line the sides as a border and Jumbo Cobblestone are laid flat for the apron. All materials are set in a crusher run base with sand. Polymeric sand is swept in the joints and misted down for the final step.
Project Year: 2016
Project Cost: $2,501 - $5,000