Apartment Renovation - 7 Wooster
Complete gut renovation of a 3 bedroom and 3 bathroom master and guest bathrooms, Included a Designed and built custom kitchen suitable for enteraining
.
The work around the apartment also included a remotely controlled system for heating, cooling, sound, security and privacy. In the living room we Installed faux brick paneling that included integration of Trane heating unit cover panels
KBR has Designed and built custom frame-less doors throughout using routed-in SOSS hinges, also installed wood floor re-finishing,
, molding, and HVAC work.
.
The work around the apartment also included a remotely controlled system for heating, cooling, sound, security and privacy. In the living room we Installed faux brick paneling that included integration of Trane heating unit cover panels
KBR has Designed and built custom frame-less doors throughout using routed-in SOSS hinges, also installed wood floor re-finishing,
, molding, and HVAC work.
Project Year: 2016
Project Cost: $500,001 - $750,000
Country: United States
Zip Code: 10013