Bernal Heights Remodel and Addition
Full home remodel with a new deck, new windows and flooring throughout, and a large excavation and addition at the garage/basement level.
The existing foundation had water intrusion issues. We excavated 8ft (over 200 cubic yards) at the existing garage/basement level and applied the preprufe 300R advanced foundation waterproofing system. We then added two bedrooms, one laundry, one utility room, one full bathroom, and a new garage at this level.
On the first floor we changed the floorplan and remodeled the kitchen, and a full bathroom with a steam shower.
On the second floor we changed the floorplan, added a bedroom, and completed a full bathroom remodel.
The new deck included an outdoor shower, hot tub, and fire pit.
The existing foundation had water intrusion issues. We excavated 8ft (over 200 cubic yards) at the existing garage/basement level and applied the preprufe 300R advanced foundation waterproofing system. We then added two bedrooms, one laundry, one utility room, one full bathroom, and a new garage at this level.
On the first floor we changed the floorplan and remodeled the kitchen, and a full bathroom with a steam shower.
On the second floor we changed the floorplan, added a bedroom, and completed a full bathroom remodel.
The new deck included an outdoor shower, hot tub, and fire pit.
Country: United States
Zip Code: 94110
Others who worked on this project: Architect Mason Kirby Inc.