Dean's Bathroom
We replaced all the original doors with newly painted wood doors and fronts. Added pull out trays where there were deep shelves, new wood drawer boxes and, new hardware and hinges all with soft close.
We had Bob's Glass remove and trim down the mirror and Kyle made a wood frame and painted it to match, then installed it. Fit perfectly in between the original tile. We also added a vented bath fan, new lav faucet and added a new higher adjustable shower arm for easier showering.
These minor updates brought this 1970's bathroom up to date without touching the tile.
We had Bob's Glass remove and trim down the mirror and Kyle made a wood frame and painted it to match, then installed it. Fit perfectly in between the original tile. We also added a vented bath fan, new lav faucet and added a new higher adjustable shower arm for easier showering.
These minor updates brought this 1970's bathroom up to date without touching the tile.
Project Year: 2021
Project Cost: $5,001 - $7,500