Aleto Construction Group
8 Reviews

Master Bathroom


Previous clients invited us back to their home for a master bathroom renovation. They wanted to remove the old dated pink tile and create a calming space while increasing overall functionality. To make their vision come to life, they worked with Aleto to switch the location of the sink and toilet which allowed for a larger vanity with more storage. The existing shower header was removed allowing for maximum height at the ceiling level. The walk-in shower was the retreat the homeowners had dreamed it would be with a corner shower seat, handheld and fixed shower heads and tile shower niche. Grab bars were added for additional safety. Convenient occupancy sensors were added to automatically turn on lights as the homeowners enter the bathroom.
Project Year: 2019
Project Cost: $25,001 - $50,000
Country: United States
Zip Code: 63123