Nexxus Design Company

NYC bathroom 1

This was a low-budget re-model of an existing bathroom. Work done included: re-tiling the floor, replacing the sink/vanity and medicine cabinet, re-grouting and skim-coating the walls, replacing the showerhead, fixing the existing towel bars. The budget did not allow for a new shower door as planned.