G.P. Harris Construction, Inc
19 Reviews

2nd floor updates

We renovated the Lebanon home updating the interior of the 2nd floor.
The second floor renovation to include remodeling the master bath with some changes in configuration, updating the guest (hall) bath, flooring throughout the 2nd floor and stairs, and removal of wallpaper and painting of the second floor walls and ceilings. The floor plan changes included enlarging the master shower, replacing the "dressing area" and reach-in closet with a walk in highly organized walk-in closet and reorganizing and lighting of an existing small closet to name a few items
The addition of a sliding barn door to the master closet and bath added that flair of modern day farmhouse . The photos were taken before "moving back in day" so the home owners eclectic touch is not shown in the photos.
All windows in the home were replaced as part of the update.
Project Year: 2019
Project Cost: $75,001 - $100,000
Country: United States