Kitchen & bathroom updates for homey atmosphere
Kitchen Countryfied Living Updating Process:
> Prepare/Demo: Protect flooring and furniture with plastic. Remove: flooring, fixtures, countertops and cabinets, vent hood ,stove, ceiling light boxes. Tape, float, and texture area as needed. Haul off all debris.
> Construct, paint, and install new wall, soft-close cabinets. Install door and drawer pulls.
> Construct, paint, and install new island, soft-close cabinets. Install door and drawer pulls.
Kitchen Countertops and Tile Backsplash:
> Install new quartz countertops Level 3 with standard edge profile and cut out for farm house sink.
> Prepare wall surfaces between cabinets for tile backsplash.
> Install and grout tile backsplash.
Kitchen Plumbing and Appliances Installed:
> Install new farm house sink and faucet and connect up plumbing.
> Install stove, vent hood, dishwasher, garbage disposal.
Kitchen Electrical:
> Install 2 pendant lights over bar. Install new switch.
> Install 4 new recess LED lights in front of kitchen cabinets.
Flooring Installed:
> Where flooring was removed prepare concrete surfaces.
> Install new Luxury Vinyl Floor in kitchen, eating area, laundry room, living space, foyer, and small hall.
> Once flooring is installed, install shoe molding along baseboards. Caulk and fill nail holes.
Additions:
> Install 24 inch new credenza on cabinet wall. Credenza will have two rows of drawers.
> At the end of the island, install new personal desk.
> Prime and paint ceiling light over dining table.
Updating the Master Bathroom:
> Demo: Remove vanity faucets, countertop and backsplash, vanity cabinets, wall mount medicine cabinet, and recessed 2nd medicine cabinet. Remove mirror.
> Construct two 36 inch wide vanity cabinets similar style as kitchen cabinet design.
> Using a level 4 quartz countertop material, install countertop with standard edge profile, two undermount sinks, and four inch backsplash; install two faucets and connect up plumbing.
> Install new wall mount medicine cabinet and new recessed medicine cabinet.
> Install two new mirrors.
> Clean up and haul off all debris.
Updating the 1/2 Bathroom:
> Demo: Remove faucet, vanity countertop & cabinet, and mirror.
> Install new cabinet.
> Install countertop provided with vanity cabinet.
> Install Penny Round Sky for backsplash. Install Signature Edge Protector around edges of tile.
> Install faucet and connect up the plumbing.
> Install new mirror.
> Clean up and haul off all debris.
> Prepare/Demo: Protect flooring and furniture with plastic. Remove: flooring, fixtures, countertops and cabinets, vent hood ,stove, ceiling light boxes. Tape, float, and texture area as needed. Haul off all debris.
> Construct, paint, and install new wall, soft-close cabinets. Install door and drawer pulls.
> Construct, paint, and install new island, soft-close cabinets. Install door and drawer pulls.
Kitchen Countertops and Tile Backsplash:
> Install new quartz countertops Level 3 with standard edge profile and cut out for farm house sink.
> Prepare wall surfaces between cabinets for tile backsplash.
> Install and grout tile backsplash.
Kitchen Plumbing and Appliances Installed:
> Install new farm house sink and faucet and connect up plumbing.
> Install stove, vent hood, dishwasher, garbage disposal.
Kitchen Electrical:
> Install 2 pendant lights over bar. Install new switch.
> Install 4 new recess LED lights in front of kitchen cabinets.
Flooring Installed:
> Where flooring was removed prepare concrete surfaces.
> Install new Luxury Vinyl Floor in kitchen, eating area, laundry room, living space, foyer, and small hall.
> Once flooring is installed, install shoe molding along baseboards. Caulk and fill nail holes.
Additions:
> Install 24 inch new credenza on cabinet wall. Credenza will have two rows of drawers.
> At the end of the island, install new personal desk.
> Prime and paint ceiling light over dining table.
Updating the Master Bathroom:
> Demo: Remove vanity faucets, countertop and backsplash, vanity cabinets, wall mount medicine cabinet, and recessed 2nd medicine cabinet. Remove mirror.
> Construct two 36 inch wide vanity cabinets similar style as kitchen cabinet design.
> Using a level 4 quartz countertop material, install countertop with standard edge profile, two undermount sinks, and four inch backsplash; install two faucets and connect up plumbing.
> Install new wall mount medicine cabinet and new recessed medicine cabinet.
> Install two new mirrors.
> Clean up and haul off all debris.
Updating the 1/2 Bathroom:
> Demo: Remove faucet, vanity countertop & cabinet, and mirror.
> Install new cabinet.
> Install countertop provided with vanity cabinet.
> Install Penny Round Sky for backsplash. Install Signature Edge Protector around edges of tile.
> Install faucet and connect up the plumbing.
> Install new mirror.
> Clean up and haul off all debris.
Project Year: 2023
Project Cost: $50,001 - $75,000
Country: United States
Zip Code: 78253