Westwood Heritage
19 Reviews

Heated Marble Foyer

We replaced the carpet and lino flooring at entry with a radiant heated marble.
The concrete subfloor had to be levelled first as the slope over a six foot span dropped 1.5inches! Upon levelling, Ditra - an uncoupling membrane from Schluter was installed along with Ditra heat. Then setting of 12x12 marble.
Project Year: 2011
Project Cost: $5,001 - $7,500
Country: Canada