San Antonio Emergency Construction

Vehicle Impact Repair at Dollar General

This emergency project involved securing and rebuilding the front section of a Dollar General in San Antonio after a vehicle crashed through the storefront. The priority was life safety, building safety and immediate stabilization. Our team responded fast, secured the structure and rebuilt the damaged area to restore safe operations.

Scope of Work
• Emergency response to stabilize the building
• Safety assessment for structural, electrical and glass hazards
• Temporary shoring and barricades to protect the public and staff
• Removal of damaged framing, storefront systems and debris
• Reconstruction of the impacted front wall section
• New framing, sheathing, exterior finishes and storefront installation
• Coordination with insurance adjusters and Dollar General management
• Final inspection and safety verification