Project 201808-009
Project 201908-009
Project 009 – New Canaan, CT
Driveway: 2.290 sqft.
Project duration: 1 day
ISSUES:
Driveway: Presents some cracks
Our Solutions:
Driveway:
On the existing asphalt, we add 2 '' of a new layer of this material; taking care that the Belgium blocks did not lose visibility by the new layer, later, we compacted it with a roller of 5 tons getting a beautiful new driveway.
Project 009 – New Canaan, CT
Driveway: 2.290 sqft.
Project duration: 1 day
ISSUES:
Driveway: Presents some cracks
Our Solutions:
Driveway:
On the existing asphalt, we add 2 '' of a new layer of this material; taking care that the Belgium blocks did not lose visibility by the new layer, later, we compacted it with a roller of 5 tons getting a beautiful new driveway.
Project Year: 2019
Project Cost: $7,501 - $10,000
Country: United States
Zip Code: 06840