Project 201906-004
Project 201906-004
Project 004 – Darien, CT
Asphalt Driveway Area: 3.327 sqft.
Oil Stone Driveway Area: 4.100 sqft.
Project duration: 4 days
ISSUES:
Asphalt Area: This area had a lot of little cracks in the driveway.
Oil Stone Area: This area had big cracks around of the driveway.
Our Solutions:
Asphalt Area: Cleaned loose material and added new asphalt layer and flattened it with a 5-ton roller.
Oil Stone Area: Applied one coat of oil, then, applied native stone in the whole area, and compacted it.
Project 004 – Darien, CT
Asphalt Driveway Area: 3.327 sqft.
Oil Stone Driveway Area: 4.100 sqft.
Project duration: 4 days
ISSUES:
Asphalt Area: This area had a lot of little cracks in the driveway.
Oil Stone Area: This area had big cracks around of the driveway.
Our Solutions:
Asphalt Area: Cleaned loose material and added new asphalt layer and flattened it with a 5-ton roller.
Oil Stone Area: Applied one coat of oil, then, applied native stone in the whole area, and compacted it.
Project Year: 2019
Project Cost: $10,001 - $25,000
Country: United States
Zip Code: 06820