LS Winston Building Corp.
22 Reviews

Transitional Kitchen Remodel (Needham)

This kitchen was completely taken down to the studs. There was a bearing wall between the kitchen and dining room that was removed to make the space wide open with clean sight lines throughout the space. Also, the ceiling above the stove was vaulted, and up-lighting was added above the cabinets in that area.
Project Year: 2015
Project Cost: $50,001 - $75,000
Country: United States