Addition - Bungalow Top-Up
This bungalow top-up addition was started on November 6, 2017, and completed on February 6, 2018 - exactly three months later. The interior of the existing house was gutted and a second-floor addition was added, with three bedrooms, a master bedroom with ensuite bath and walk-in closet, a 2nd bathroom on the 2nd floor, and a ground floor 3-piece bathroom. All mechanical systems were upgraded and insulation increased to above-code standards.
Project Year: 2018
Country: Canada
Zip Code: M1R 3X6