Before and After Builders, Inc.
110 Reviews

Jackson Hall Bathroom

Gutted this non functioning hall bathroom! Installed a pocket door, which made all the difference in the functionality of the space. Moved the toilet, vanity, linen closet, and increased the size of the shower! Installed porcelain tile in the shower with a mosaic glass/stone band. Installed tongue and groove beadboard with chair rail to the walls. Installed new recessed light/fan in the ceiling. Installed new vanity light, Kohler vanity faucet, toilet, and shower fixture.
Project Year: 2015
Project Cost: $10,001 - $25,000
Country: United States
Zip Code: 38242